Efficiency in High-Rise Building Design: A Lean Approach to Waste Identification and Reduction

The design phase of buildings represents a dynamic and complex process, constantly evolving with modifications and feedback. It involves numerous professionals from various specialties, resulting in a fragmented and iterative trial-and-error process. Analyzing waste is the first step towards increasing the efficiency of the design process for high-rise buildings using Lean methodology. Initially, the design phase was characterized, and processes were classified into productive, contributory, and non-contributory work. Typical waste in building design was identified, analyzed, and ranked based on frequency and impact to facilitate understanding and elimination. Three traditional design stages were identified: Schematic Design (SD), Design Development (DD), and Construction Documentation (CD). A total of 33 typical wastes were classified into the eight Lean categories. Key waste ranked by the Frequency-Adjusted Importance Index (FAII) for cost, schedule, and quality metrics were late-stage design changes, waiting for resources and information, rework, and late-stage clarification of requirements.

Authors

Institutions

Publication Details

Journal
Systems
Published
2025-09-05
DOI
https://doi.org/10.3390/systems13090782
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
0.00

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Efficiency in High-Rise Building Design: A Lean Approach to Waste Identification and Reduction

Eric Forcael, Karen Castañeda, Rodrigo F. Herrera, Nicolás Morales-Caballero
Systems
BIM and Construction Integration
article

Efficiency in High-Rise Building Design: A Lean Approach to Waste Identification and Reduction

Eric Forcael, Karen Castañeda, Rodrigo F. Herrera, Nicolás Morales-Caballero
article en

Abstract

The design phase of buildings represents a dynamic and complex process, constantly evolving with modifications and feedback. It involves numerous professionals from various specialties, resulting in a fragmented and iterative trial-and-error process. Analyzing waste is the first step towards increasing the efficiency of the design process for high-rise buildings using Lean methodology. Initially, the design phase was characterized, and processes were classified into productive, contributory, and non-contributory work. Typical waste in building design was identified, analyzed, and ranked based on frequency and impact to facilitate understanding and elimination. Three traditional design stages were identified: Schematic Design (SD), Design Development (DD), and Construction Documentation (CD). A total of 33 typical wastes were classified into the eight Lean categories. Key waste ranked by the Frequency-Adjusted Importance Index (FAII) for cost, schedule, and quality metrics were late-stage design changes, waiting for resources and information, rework, and late-stage clarification of requirements.

SystemsVol. 13(9)
Pontificia Universidad Católica de Valparaíso (CL), San Sebastián University (CL)
Pontificia Universidad Católica de Valparaíso
Openalex Percentile: Top 74%
BIM and Construction Integration
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Efficiency in High-Rise Building Design: A Lean Approach to Waste Identification and Reduction — Eric Forcael, Karen Castañeda, et al. · Systems (2025) | TGRS Research Map | TGRS