Identifying and Assessing Suspension Risks of Public Infrastructure Projects

Purpose: The long construction period of public infrastructure projects increases the probability of facing political and economic turmoil, which might be triggered by national and/or international instabilities. Combined with the chronic peculiarity of these projects, such as delays and cost overruns, political and economic turmoil could lead to the temporary suspension of public infrastructure projects since the governments and/or public authorities fail to allocate sufficient financial resources. However, suspension decision for public infrastructure projects poses a wide range of risks that are widely neglected in the literature. Thus, this study proposes a suspension risk management framework by identifying and assessing the risks that may arise after the suspension of public infrastructure projects. The study also investigates perception differences among the leading stakeholders of the public infrastructure projects to ensure that the stakeholders could formalize shared risk response strategies. Initially, a comprehensive literature review and focus group discussion (FGD) sessions were conducted to identify the suspension risks. Next, the questionnaire survey and fuzzy TOPSIS analysis were jointly implemented to determine the significance of each risk. Finally, Cronbach’s alpha analysis and the Mann-Whitney U test were implemented to examine the reliability of the dataset and the perception differences. The results indicated that the suspension decision of infrastructure projects has financial, technical, managerial, social, and environmental implications. Therefore, the suspension risks proposed in this study should be analyzed deeply before the suspension decision is given. Besides, the results pinpointed risks such as “Uncertainties due to constant changes in the contract,” “Financial losses arising from the judicial and/or alternative dispute resolution processes,” and “Administrative difficulties in obtaining financing in the re-starting period” as the most critical suspension risk factors, necessitating urgent and comprehensive risk response strategies. Lastly, the Mann-Whitney U test validated that the proposed framework could be implemented by contracting parties to formulate shared risk response strategies in infrastructure projects.

Authors

Institutions

Publication Details

Journal
Turkish Journal of Civil Engineering
Published
2025-09-05
DOI
https://doi.org/10.18400/tjce.1647446
Citations
1
Primary Topic
Public-Private Partnership Projects
Type
article
Field-Weighted Citation Impact
2.23
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Identifying and Assessing Suspension Risks of Public Infrastructure Projects

Gökhan Demirdöğen, Ozan Okudan, Zeynep Işık, Fehmi Samet Demirci
1 citations
Turkish Journal of Civil Engineering
Public-Private Partnership Projects
2.23
article

Identifying and Assessing Suspension Risks of Public Infrastructure Projects

Gökhan Demirdöğen, Ozan Okudan, Zeynep Işık, Fehmi Samet Demirci
article en
1 citations

Abstract

Purpose: The long construction period of public infrastructure projects increases the probability of facing political and economic turmoil, which might be triggered by national and/or international instabilities. Combined with the chronic peculiarity of these projects, such as delays and cost overruns, political and economic turmoil could lead to the temporary suspension of public infrastructure projects since the governments and/or public authorities fail to allocate sufficient financial resources. However, suspension decision for public infrastructure projects poses a wide range of risks that are widely neglected in the literature. Thus, this study proposes a suspension risk management framework by identifying and assessing the risks that may arise after the suspension of public infrastructure projects. The study also investigates perception differences among the leading stakeholders of the public infrastructure projects to ensure that the stakeholders could formalize shared risk response strategies. Initially, a comprehensive literature review and focus group discussion (FGD) sessions were conducted to identify the suspension risks. Next, the questionnaire survey and fuzzy TOPSIS analysis were jointly implemented to determine the significance of each risk. Finally, Cronbach’s alpha analysis and the Mann-Whitney U test were implemented to examine the reliability of the dataset and the perception differences. The results indicated that the suspension decision of infrastructure projects has financial, technical, managerial, social, and environmental implications. Therefore, the suspension risks proposed in this study should be analyzed deeply before the suspension decision is given. Besides, the results pinpointed risks such as “Uncertainties due to constant changes in the contract,” “Financial losses arising from the judicial and/or alternative dispute resolution processes,” and “Administrative difficulties in obtaining financing in the re-starting period” as the most critical suspension risk factors, necessitating urgent and comprehensive risk response strategies. Lastly, the Mann-Whitney U test validated that the proposed framework could be implemented by contracting parties to formulate shared risk response strategies in infrastructure projects.

Turkish Journal of Civil EngineeringVol. 37(1)
Yıldız Technical University (TR)
Openalex Percentile: Top 9%
Public-Private Partnership Projects
2.23
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.