Analisis Pengendalian Mutu Pekerjaan Timbunan Random Batu pada Proyek Pembangunan Bendungan Way Apu

Dam is a structure consisting of earth, rock, and concrete embankments built to retain and contain water. Dam embankment work is generally carried out with the longest schedule during each dry season. The Way Apu Dam Construction Project experienced flooding due to the overflow of the Way Teba river exceeding the cofferdam on July 5, 2024, which could potentially reduce the quality of random rock embankment work. This study aims to analyze the factors that influence quality control of random rock embankment work using quantitative descriptive methods through statistical analysis with SPSS software. Data was collected through questionnaires to 44 respondents involved in the project. Factors influencing quality control were determined by multiple linear regression tests using the stepwise method. The results showed that there are 4 significant variables: "Worker Awareness in Quality Assurance and Control", "Documentation of Monitoring and Measurement Results at Each Stage of Work", "Documentation of Material Loading Checked by Field Director/Consultant", "Report on Hazard Identification, Risk Assessment, Control and Opportunities for Construction Safety" with F_count value = 34.334. The most dominant variable is "Worker Awareness in Quality Assurance and Control" based on T_count value = 8.929.

Authors

Institutions

Publication Details

Journal
Jurnal Impresi Indonesia
Published
2025-08-25
DOI
https://doi.org/10.58344/jii.v4i8.6964
Primary Topic
Urban Transport Systems Analysis
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Analisis Pengendalian Mutu Pekerjaan Timbunan Random Batu pada Proyek Pembangunan Bendungan Way Apu

Ayu Handayani, Erwin Batista
Jurnal Impresi Indonesia
Urban Transport Systems Analysis
article

Analisis Pengendalian Mutu Pekerjaan Timbunan Random Batu pada Proyek Pembangunan Bendungan Way Apu

Ayu Handayani, Erwin Batista
article en

Abstract

Dam is a structure consisting of earth, rock, and concrete embankments built to retain and contain water. Dam embankment work is generally carried out with the longest schedule during each dry season. The Way Apu Dam Construction Project experienced flooding due to the overflow of the Way Teba river exceeding the cofferdam on July 5, 2024, which could potentially reduce the quality of random rock embankment work. This study aims to analyze the factors that influence quality control of random rock embankment work using quantitative descriptive methods through statistical analysis with SPSS software. Data was collected through questionnaires to 44 respondents involved in the project. Factors influencing quality control were determined by multiple linear regression tests using the stepwise method. The results showed that there are 4 significant variables: "Worker Awareness in Quality Assurance and Control", "Documentation of Monitoring and Measurement Results at Each Stage of Work", "Documentation of Material Loading Checked by Field Director/Consultant", "Report on Hazard Identification, Risk Assessment, Control and Opportunities for Construction Safety" with F_count value = 34.334. The most dominant variable is "Worker Awareness in Quality Assurance and Control" based on T_count value = 8.929.

Jurnal Impresi IndonesiaVol. 4(8)
Mercu Buana University (ID)
Openalex Percentile: Top 75%
Urban Transport Systems Analysis
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.