Strategic Approaches of Project Managers to Enhance Cost Efficiency and Timeliness in Construction Projects

This paper explores the crucial problems of delays and cost overruns in the building industry, acknowledging that these problems are costly and can cause conflict. Four main reasons are found by looking through the literature: external factors, owner responsibility, contractor responsibility, and consultant duty. The article promotes the use of the Building Information Model (BIM) as a potent tool for effective project management in order to overcome these issues. The benefits of BIM—better estimating, collision detection, and integration, among others—are discussed, with an emphasis on how they help to lower delays and budget overruns. The article emphasizes the need of thorough project planning, control, and monitoring and suggests using modern computer technology to increase feasibility and transparency. To guarantee on-time payments and project completion, the significance of cash flow management and an expedited implementation process is emphasized. The conclusion exhorts technical departments and building companies to use contemporary technologies, offering centralized blueprints, comprehensive plans, and qualified labor for accelerated projects. In general, the paper advocates for a proactive strategy to surmount obstacles, enhance project results, and promote expansion within the construction industry

Authors

Institutions

Publication Details

Journal
International Journal for Research in Applied Science and Engineering Technology
Published
2025-09-04
DOI
https://doi.org/10.22214/ijraset.2025.73987
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Strategic Approaches of Project Managers to Enhance Cost Efficiency and Timeliness in Construction Projects

Abhishek Tripathi
1 links
International Journal for Research in Applied Science and Engineering Technology
Construction Project Management and Performance
article

Strategic Approaches of Project Managers to Enhance Cost Efficiency and Timeliness in Construction Projects

Abhishek Tripathi
article en

Abstract

This paper explores the crucial problems of delays and cost overruns in the building industry, acknowledging that these problems are costly and can cause conflict. Four main reasons are found by looking through the literature: external factors, owner responsibility, contractor responsibility, and consultant duty. The article promotes the use of the Building Information Model (BIM) as a potent tool for effective project management in order to overcome these issues. The benefits of BIM—better estimating, collision detection, and integration, among others—are discussed, with an emphasis on how they help to lower delays and budget overruns. The article emphasizes the need of thorough project planning, control, and monitoring and suggests using modern computer technology to increase feasibility and transparency. To guarantee on-time payments and project completion, the significance of cash flow management and an expedited implementation process is emphasized. The conclusion exhorts technical departments and building companies to use contemporary technologies, offering centralized blueprints, comprehensive plans, and qualified labor for accelerated projects. In general, the paper advocates for a proactive strategy to surmount obstacles, enhance project results, and promote expansion within the construction industry

International Journal for Research in Applied Science and Engineering TechnologyVol. 13(9)
ITM University (IN)
Openalex Percentile: Top 72%
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.