Impact analysis of supplementing solar generation sites with additional wind generation considering grid connection delays

Grid connection delays are currently causing significant issues for new renewable generation projects in Great Britain. The National Energy System Operator (NESO) has recently closed the connection queue to new requests, with over 700GW of new projects currently awaiting responses to connection requests. The average gap between requested and offered connection dates has increased to 5 years and despite an ongoing connection reform process the challenges faced by new renewable generation projects are putting net zero objectives at risk. In this paper, a novel techno-economic investigation is performed into the potential impact of increasing the generation capacity of a solar generation site through the addition of wind generation. The study considers varying time horizons for increased grid connections and how this impacts the levelized cost of energy (LCOE) and net present value (NPV) of the site. Results show positive implications with a 5 year connection delay, showing a possible reduction in LCOE of £1.86/MWh over a 20 year lifetime.

Authors

Institutions

Publication Details

Published
2025-06-24
DOI
https://doi.org/10.1109/iccep65222.2025.11143762
Primary Topic
Energy and Environment Impacts
Type
article
Field-Weighted Citation Impact
0.00

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Impact analysis of supplementing solar generation sites with additional wind generation considering grid connection delays

Andrew J. Hutchinson, Daniel T. Gladwin, Hui Yan, Jonathan Radcliffe et al.
Energy and Environment Impacts
article

Impact analysis of supplementing solar generation sites with additional wind generation considering grid connection delays

Andrew J. Hutchinson, Daniel T. Gladwin, Hui Yan, Jonathan Radcliffe, Thomas S. Bryden, Andrew J. Forsyth, Arman Alahyari, Daniel J. Rogers, Charalampos Patsios, Sheng Wang, Sam Eardley
article en

Abstract

Grid connection delays are currently causing significant issues for new renewable generation projects in Great Britain. The National Energy System Operator (NESO) has recently closed the connection queue to new requests, with over 700GW of new projects currently awaiting responses to connection requests. The average gap between requested and offered connection dates has increased to 5 years and despite an ongoing connection reform process the challenges faced by new renewable generation projects are putting net zero objectives at risk. In this paper, a novel techno-economic investigation is performed into the potential impact of increasing the generation capacity of a solar generation site through the addition of wind generation. The study considers varying time horizons for increased grid connections and how this impacts the levelized cost of energy (LCOE) and net present value (NPV) of the site. Results show positive implications with a 5 year connection delay, showing a possible reduction in LCOE of £1.86/MWh over a 20 year lifetime.

University of Manchester (GB), University of Oxford (GB), Science Oxford (GB), University of Birmingham (GB), Newcastle University (GB), University of Sheffield (GB)
Engineering and Physical Sciences Research Council
Openalex Percentile: Top 82%
Energy and Environment Impacts
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.