Applying Lean Six Sigma Methodology to Improve Productivity: Case Study at a Mooncake Production Enterprise

This study aims to apply the Lean Six Sigma methodology to reduce defect rates at a mooncake production company. The study reveals that the highest defect rate, recorded at 3.78%, occurred during the semi-finished product shaping stage. The research uses the Pareto chart to analyse the causes of the defects, while the Delphi method and cause-and-effect diagrams are applied to identify the root causes of the primary defects. To enhance the process, the research team adjust the technical specifications of the shaping mould and employ a t-test to evaluate the statistical significance of the improvement results. As a result, the defect rate was significantly reduced from 3.78% to 3.12%. This improvement leads to an increase in the Sigma level from 3.28 to 3.36, resulting in annual cost savings of USD 6,018 for the company. Looking ahead, the DMAIC methodology can be further applied to address other defect rates within the mooncake production process.

Authors

Publication Details

Journal
Management and Production Engineering Review
Published
2025-06-30
DOI
https://doi.org/10.24425/mper.2025.154933
Primary Topic
Quality and Supply Management
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Applying Lean Six Sigma Methodology to Improve Productivity: Case Study at a Mooncake Production Enterprise

Nguyễn Thị Thuỳ Vân, Trung Thành Nguyễn, Nguyen Khac Hieu, Duan KHUU
Management and Production Engineering Review
Quality and Supply Management
article

Applying Lean Six Sigma Methodology to Improve Productivity: Case Study at a Mooncake Production Enterprise

Nguyễn Thị Thuỳ Vân, Trung Thành Nguyễn, Nguyen Khac Hieu, Duan KHUU
article en

Abstract

This study aims to apply the Lean Six Sigma methodology to reduce defect rates at a mooncake production company. The study reveals that the highest defect rate, recorded at 3.78%, occurred during the semi-finished product shaping stage. The research uses the Pareto chart to analyse the causes of the defects, while the Delphi method and cause-and-effect diagrams are applied to identify the root causes of the primary defects. To enhance the process, the research team adjust the technical specifications of the shaping mould and employ a t-test to evaluate the statistical significance of the improvement results. As a result, the defect rate was significantly reduced from 3.78% to 3.12%. This improvement leads to an increase in the Sigma level from 3.28 to 3.36, resulting in annual cost savings of USD 6,018 for the company. Looking ahead, the DMAIC methodology can be further applied to address other defect rates within the mooncake production process.

Management and Production Engineering Review
Openalex Percentile: Top 61%
Quality and Supply Management
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Applying Lean Six Sigma Methodology to Improve Productivity: Case Study at a Mooncake Production Enterprise — Nguyễn Thị Thuỳ Vân, Trung Thành Nguyễn, et al. · Management and Production Engineering Review (2025) | TGRS Research Map | TGRS