Solving the Two-Stage Design Interest Paradox Between Chinese EPC Project Owners and General Contractors: A Case Study

In recent years, China has vigorously promoted the EPC mode in the construction industry. However, under the weak trust environment of China’s construction industry, both owners and general contractors are involved in the design stage of EPC projects. Owing to conflicting interests in the design stage, there is a two-stage design interest paradox between the owners and general contractors of Chinese EPC projects, and this causes significant difficulties and challenges for project implementation. To resolve this paradox, this study proposes the “DART-PDCA” design management model by integrating value co-creation theory with the PDCA cycle. Applied to the Yuzhou High-speed Rail Station Square and Related Infrastructure PPP Project and the extended case, the model demonstrates how it resolves the paradox by (1) establishing structured dialogue platforms for aligning evolving design intentions, (2) enhancing information access and transparency through agreed protocols, and (3) facilitating dynamic risk assessment and allocation mechanisms. The results confirm that (1) the two-stage design interest paradox negatively impacts design management quality in China’s low-trust environment; and (2) the “DART-PDCA” design management model effectively resolves this paradox, leading to demonstrable improvements in design management quality, efficiency, and stakeholder alignment. This research forges novel interdisciplinary linkages among owner–general contractor relationships, design management, and EPC projects, providing critical insights into managing multi-organizational dynamics in complex EPC project environments.

Authors

Institutions

Publication Details

Journal
Buildings
Published
2025-09-02
DOI
https://doi.org/10.3390/buildings15173162
Primary Topic
Service and Product Innovation
Type
article
Field-Weighted Citation Impact
0.00

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Solving the Two-Stage Design Interest Paradox Between Chinese EPC Project Owners and General Contractors: A Case Study

Yinan Li, Xinyuan Song, Xiaolin Li, Ruirui Zhang et al.
Buildings
Service and Product Innovation
article

Solving the Two-Stage Design Interest Paradox Between Chinese EPC Project Owners and General Contractors: A Case Study

Yinan Li, Xinyuan Song, Xiaolin Li, Ruirui Zhang, Wei‐Ling Chang, Yilin Yin
article en

Abstract

In recent years, China has vigorously promoted the EPC mode in the construction industry. However, under the weak trust environment of China’s construction industry, both owners and general contractors are involved in the design stage of EPC projects. Owing to conflicting interests in the design stage, there is a two-stage design interest paradox between the owners and general contractors of Chinese EPC projects, and this causes significant difficulties and challenges for project implementation. To resolve this paradox, this study proposes the “DART-PDCA” design management model by integrating value co-creation theory with the PDCA cycle. Applied to the Yuzhou High-speed Rail Station Square and Related Infrastructure PPP Project and the extended case, the model demonstrates how it resolves the paradox by (1) establishing structured dialogue platforms for aligning evolving design intentions, (2) enhancing information access and transparency through agreed protocols, and (3) facilitating dynamic risk assessment and allocation mechanisms. The results confirm that (1) the two-stage design interest paradox negatively impacts design management quality in China’s low-trust environment; and (2) the “DART-PDCA” design management model effectively resolves this paradox, leading to demonstrable improvements in design management quality, efficiency, and stakeholder alignment. This research forges novel interdisciplinary linkages among owner–general contractor relationships, design management, and EPC projects, providing critical insights into managing multi-organizational dynamics in complex EPC project environments.

BuildingsVol. 15(17)
Tianjin University of Technology (CN), North China University of Water Resources and Electric Power (CN), China Resources (China) (CN)
National Office for Philosophy and Social Sciences
Openalex Percentile: Top 69%
Service and Product Innovation
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.