Optimizing Well Design with MPD and IME: A Case Study from Offshore Mexico

Abstract This paper presents the application of Managed Pressure Drilling (MPD) techniques and the Influx Management Envelope (IME) methodology in an offshore well in the Mexican Gulf of Mexico (GoM). Drawing on insights from SPE/IADC-200509-MS, SPE/IADC-200504-MS, and SPE/IADC-200514-MS, an adaptive casing design was implemented to address uncertainties in pore pressure (PP) and fracture gradient (FG). This approach facilitated deeper casing points, enhanced decision-making, and improved influx management. MPD ensured constant bottomhole pressure (BHP), enhanced formation pressure monitoring, and strengthened well control. The paper highlights the benefits of early MPD integration, cost savings, and key lessons learned, including the importance of gap analysis, early adoption, and tailored training for all stakeholders.

Authors

Institutions

Publication Details

Published
2025-09-02
DOI
https://doi.org/10.2118/spe-228386-ms
Citations
1
Primary Topic
Reservoir Engineering and Simulation Methods
Type
article
Field-Weighted Citation Impact
1.15
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Optimizing Well Design with MPD and IME: A Case Study from Offshore Mexico

P. Cavalcanti de Sousa, José Ferro, L. Correa, C. Fuenmayor
1 citations
Reservoir Engineering and Simulation Methods
1.15
article

Optimizing Well Design with MPD and IME: A Case Study from Offshore Mexico

P. Cavalcanti de Sousa, José Ferro, L. Correa, C. Fuenmayor
article en
1 citations

Abstract

Abstract This paper presents the application of Managed Pressure Drilling (MPD) techniques and the Influx Management Envelope (IME) methodology in an offshore well in the Mexican Gulf of Mexico (GoM). Drawing on insights from SPE/IADC-200509-MS, SPE/IADC-200504-MS, and SPE/IADC-200514-MS, an adaptive casing design was implemented to address uncertainties in pore pressure (PP) and fracture gradient (FG). This approach facilitated deeper casing points, enhanced decision-making, and improved influx management. MPD ensured constant bottomhole pressure (BHP), enhanced formation pressure monitoring, and strengthened well control. The paper highlights the benefits of early MPD integration, cost savings, and key lessons learned, including the importance of gap analysis, early adoption, and tailored training for all stakeholders.

Total (France) (FR), Saratoga Energy Research Partners (United States) (US)
Openalex Percentile: Top 19%
Reservoir Engineering and Simulation Methods
1.15
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.