Best Practices and Lessons from the Extended Pilot CO2 Injection Test on Leman Ultra-Depleted Gas Field, UK Southern North Sea

Abstract Dynamic reservoir evaluation through temporary and periodic CO2 injection is crucial for effective Carbon Capture and Storage (CCS) project planning. This study presents a pioneering extended pilot test conducted in the Leman ultra-depleted gas field in the UK Southern North Sea, focusing on CO2 injection in gaseous, supercritical, and liquid phases. The project utilised a temporary surface injection plant, incorporating storage tanks, well test equipment, high-pressure and low-pressure injection pumps, pushing the boundaries of industry standards for offshore CO2 injection. Handling and injecting liquid CO2 at the surface from transportable iso-tanks into an ultra-depleted gas reservoir presents unique technical and operational challenges. The process requires specialised low-temperature-rated piping, pressure management systems, and non-standard equipment to ensure safe and efficient injection operations. While most temporary CO2 injection tests are conducted over short durations and involve only the liquid phase, this extended three-month pilot test necessitated injection across gaseous, supercritical, and liquid phases. The complexity of switching between CO2 phases while maintaining operational integrity sets this project apart from any previous offshore CCS pilot tests. This paper details the design, execution, and key findings from the extended CO2 injection pilot test in the Leman ultra-depleted gas field. The test comprised of 15 injection cycles, each involving up to 8 hours of pumping of up to 400 metric tonnes of CO2, followed by a three-day observation period to assess reservoir response. The study also provides practical insights, operational lessons, and the best practices for industry professionals planning similar offshore CCS pilot projects. During the test, liquid CO2 was pumped from iso-tanks at rates up to 13 bbl/min (equivalent to 1.1 Mtpa), using two booster pumps and three high-pressure pumping units. This surface plant also included liquid CO2 tank storage, a metering system, three steam exchangers (two standard and one high-efficiency) to control temperature and phase transitions before injection into a re-completed gas producer well. For real-time monitoring, the well was instrumented with a comprehensive fibre-optic DAS+DTS array and multiple pressure sensors, enabling continuous tracking of CO2 behaviour from wellhead to perforations. Special attention was given to data visualisation, processing capabilities, and safety protocols, including surface equipment preservation, start-up procedures, and pressure bleed-off management using a dedicated instrumented low-temperature-rated bleed-off line. Offshore CO2 injection in ultra-depleted reservoirs remains underexplored, with limited industry knowledge. This test is the first of its kind to evaluate CO2 injection under a wide range of conditions, including gaseous, supercritical, and liquid phases, providing invaluable insights into reservoir response during CO2 injection. The knowledge and practical experience gained from this operation are invaluable and will pave the way for future successful pilot CO2 injection tests for evaluating CCS assets in the UK and globally.

Authors

Institutions

Publication Details

Published
2025-09-02
DOI
https://doi.org/10.2118/226725-ms
Primary Topic
Reservoir Engineering and Simulation Methods
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Best Practices and Lessons from the Extended Pilot CO2 Injection Test on Leman Ultra-Depleted Gas Field, UK Southern North Sea

Nicolas Dupouy, B. Theuveny, P Giraud, Doris L. Mackinnon et al.
Reservoir Engineering and Simulation Methods
article

Best Practices and Lessons from the Extended Pilot CO2 Injection Test on Leman Ultra-Depleted Gas Field, UK Southern North Sea

Nicolas Dupouy, B. Theuveny, P Giraud, Doris L. Mackinnon, Aydyn Agayev, Y. Shumakov, Feng Wang, V. Pequignot, M. Puig-Alenya, D. Andres Kuettel, R. Verhulst, A. Kohr
article en

Abstract

Abstract Dynamic reservoir evaluation through temporary and periodic CO2 injection is crucial for effective Carbon Capture and Storage (CCS) project planning. This study presents a pioneering extended pilot test conducted in the Leman ultra-depleted gas field in the UK Southern North Sea, focusing on CO2 injection in gaseous, supercritical, and liquid phases. The project utilised a temporary surface injection plant, incorporating storage tanks, well test equipment, high-pressure and low-pressure injection pumps, pushing the boundaries of industry standards for offshore CO2 injection. Handling and injecting liquid CO2 at the surface from transportable iso-tanks into an ultra-depleted gas reservoir presents unique technical and operational challenges. The process requires specialised low-temperature-rated piping, pressure management systems, and non-standard equipment to ensure safe and efficient injection operations. While most temporary CO2 injection tests are conducted over short durations and involve only the liquid phase, this extended three-month pilot test necessitated injection across gaseous, supercritical, and liquid phases. The complexity of switching between CO2 phases while maintaining operational integrity sets this project apart from any previous offshore CCS pilot tests. This paper details the design, execution, and key findings from the extended CO2 injection pilot test in the Leman ultra-depleted gas field. The test comprised of 15 injection cycles, each involving up to 8 hours of pumping of up to 400 metric tonnes of CO2, followed by a three-day observation period to assess reservoir response. The study also provides practical insights, operational lessons, and the best practices for industry professionals planning similar offshore CCS pilot projects. During the test, liquid CO2 was pumped from iso-tanks at rates up to 13 bbl/min (equivalent to 1.1 Mtpa), using two booster pumps and three high-pressure pumping units. This surface plant also included liquid CO2 tank storage, a metering system, three steam exchangers (two standard and one high-efficiency) to control temperature and phase transitions before injection into a re-completed gas producer well. For real-time monitoring, the well was instrumented with a comprehensive fibre-optic DAS+DTS array and multiple pressure sensors, enabling continuous tracking of CO2 behaviour from wellhead to perforations. Special attention was given to data visualisation, processing capabilities, and safety protocols, including surface equipment preservation, start-up procedures, and pressure bleed-off management using a dedicated instrumented low-temperature-rated bleed-off line. Offshore CO2 injection in ultra-depleted reservoirs remains underexplored, with limited industry knowledge. This test is the first of its kind to evaluate CO2 injection under a wide range of conditions, including gaseous, supercritical, and liquid phases, providing invaluable insights into reservoir response during CO2 injection. The knowledge and practical experience gained from this operation are invaluable and will pave the way for future successful pilot CO2 injection tests for evaluating CCS assets in the UK and globally.

Mallinckrodt (Ireland) (IE)
Openalex Percentile: Top 72%
Reservoir Engineering and Simulation Methods
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.