The Study of System Availability with Reboot Delay

This paper extracts the availability of a warm standby system with reboot delay and switching failures. The system is studied under the assumption that the time-to-failure and the time to repair of the primary and standby units are exponentially and generally distributed, respectively. There is a possibility of failures during the switching from standby state to primary state. Reboot delay happens in this switching procedure of a standby unit to primary unit. The reboot time is assumed to be exponentially distributed. It is assumed that there is a significant probability of a switching failure. Primary and warm standby units can be considered to be repairable. Using the supplementary variable technique we develop the explicit expressions for the steady state availability.

Authors

Institutions

Publication Details

Journal
International Journal on Science and Technology
Published
2025-08-29
DOI
https://doi.org/10.71097/ijsat.v16.i3.7916
Primary Topic
Software Reliability and Analysis Research
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

The Study of System Availability with Reboot Delay

Sanjay Chaudhary, Kanta kanta
International Journal on Science and Technology
Software Reliability and Analysis Research
article

The Study of System Availability with Reboot Delay

Sanjay Chaudhary, Kanta kanta
article en

Abstract

This paper extracts the availability of a warm standby system with reboot delay and switching failures. The system is studied under the assumption that the time-to-failure and the time to repair of the primary and standby units are exponentially and generally distributed, respectively. There is a possibility of failures during the switching from standby state to primary state. Reboot delay happens in this switching procedure of a standby unit to primary unit. The reboot time is assumed to be exponentially distributed. It is assumed that there is a significant probability of a switching failure. Primary and warm standby units can be considered to be repairable. Using the supplementary variable technique we develop the explicit expressions for the steady state availability.

International Journal on Science and TechnologyVol. 16(3)
Dr. Bhim Rao Ambedkar University (IN), Ambedkar University Delhi (IN)
Openalex Percentile: Top 76%
Software Reliability and Analysis Research
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

The Study of System Availability with Reboot Delay — Sanjay Chaudhary, Kanta kanta · International Journal on Science and Technology (2025) | TGRS Research Map | TGRS