Research on the Value-Added Pathways of Government-Invested EPC Projects Based on DEMATEL–TAISM–MICMAC

Government-invested Engineering, Procurement, and Construction (EPC) projects often encounter challenges, such as ambiguous value-added pathways and undefined key driving mechanisms, which impede efficiency improvements during implementation. To systematically elucidate the value-added pathways and core driving mechanisms in these projects, this study identified and distilled 20 critical influencing factors across four dimensions—contract cost, organization, technology, and environment—through a combination of a literature review, case analysis, and a questionnaire survey yielding 68 valid responses. Employing a DEMATEL–TAISM–MICMAC hybrid model, the research conducted an in-depth analysis: the DEMATEL method quantified the interdependencies among factors and identified key causal elements; a TAISM-directed topological hierarchy diagram was constructed to clearly delineate the hierarchical transmission pathways; and the MICMAC model was utilized for driver–dependency analysis, classifying factor roles and providing cross-validation from three analytical perspectives. The results indicate that S12 (collaborative participation in early planning and design phases) exhibits the highest causal influence and serves as the core driving factor, while S1 (detailed and explicit contractual clauses) and S12 are positioned at the root level of the hierarchical model, functioning as foundational independent factors that regulate the entire system. The value-added pathways are characterized by a hierarchical transmission logic of “root level → transitional level → direct level”. Based on these findings, the study proposes a system optimization strategy of “strengthening the root level, optimizing the transitional level, and safeguarding the direct level”, thereby offering both theoretical insights and practical guidance for enhancing the value-added efficiency of government-invested EPC projects.

Authors

Institutions

Publication Details

Journal
Buildings
Published
2025-09-01
DOI
https://doi.org/10.3390/buildings15173134
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Research on the Value-Added Pathways of Government-Invested EPC Projects Based on DEMATEL–TAISM–MICMAC

Shikang Liu, Shenghong Wu, Lei Wang
Buildings
Construction Project Management and Performance
article

Research on the Value-Added Pathways of Government-Invested EPC Projects Based on DEMATEL–TAISM–MICMAC

Shikang Liu, Shenghong Wu, Lei Wang
article en

Abstract

Government-invested Engineering, Procurement, and Construction (EPC) projects often encounter challenges, such as ambiguous value-added pathways and undefined key driving mechanisms, which impede efficiency improvements during implementation. To systematically elucidate the value-added pathways and core driving mechanisms in these projects, this study identified and distilled 20 critical influencing factors across four dimensions—contract cost, organization, technology, and environment—through a combination of a literature review, case analysis, and a questionnaire survey yielding 68 valid responses. Employing a DEMATEL–TAISM–MICMAC hybrid model, the research conducted an in-depth analysis: the DEMATEL method quantified the interdependencies among factors and identified key causal elements; a TAISM-directed topological hierarchy diagram was constructed to clearly delineate the hierarchical transmission pathways; and the MICMAC model was utilized for driver–dependency analysis, classifying factor roles and providing cross-validation from three analytical perspectives. The results indicate that S12 (collaborative participation in early planning and design phases) exhibits the highest causal influence and serves as the core driving factor, while S1 (detailed and explicit contractual clauses) and S12 are positioned at the root level of the hierarchical model, functioning as foundational independent factors that regulate the entire system. The value-added pathways are characterized by a hierarchical transmission logic of “root level → transitional level → direct level”. Based on these findings, the study proposes a system optimization strategy of “strengthening the root level, optimizing the transitional level, and safeguarding the direct level”, thereby offering both theoretical insights and practical guidance for enhancing the value-added efficiency of government-invested EPC projects.

BuildingsVol. 15(17)
Shihezi University (CN), People's Government of Shaanxi Province (CN)
Openalex Percentile: Top 73%
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.