Transactional Risk Management in Construction and Reconstruction Investment Projects Using MATLAB Simulink and Fuzzy Decision Support Systems

The study proposes a simulation model of the interaction between the main participants in a construction and reconstruction investment project: the customer and the contractor. Both parties strive to satisfy their economic interests. However, prioritizing immediate gains exposes them to significant long-term losses. The priorities of the customer and the contractor in fulfilling contractual obligations are modeled using fuzzy logic inference algorithms. The inputs of these algorithms are determined by assessing the business partner’s value and the party’s market position. The model captures how fulfilling or failing to meet contractual obligations alters the parties’ attitudes and responsibilities. The developed simulation model assesses how the project outcome is affected by the parties’ subjective evaluations regarding the timing of work and payments, and the allocation of limited resources. The study also examines the proportions between the economic consequences of contractual breaches and substantiates the net intertemporal effect of financial resource savings. The analysis of the residential real estate market values and their variability, due to differences in technical conditions and location, provided the basis for determining the benefits and losses of underfinancing construction and reconstruction work. Assessing lost benefits from delayed delivery of finished construction objects considers expected and pessimistic scenarios, reflecting the price volatility in the primary and secondary housing markets.

Authors

Institutions

Publication Details

Published
2025-05-14
DOI
https://doi.org/10.1109/sist61657.2025.11139257
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Transactional Risk Management in Construction and Reconstruction Investment Projects Using MATLAB Simulink and Fuzzy Decision Support Systems

Andrii Rosynskyi, Oleh Onofriichuk, Maksym Maltsev, Lesia Sorokina et al.
BIM and Construction Integration
article

Transactional Risk Management in Construction and Reconstruction Investment Projects Using MATLAB Simulink and Fuzzy Decision Support Systems

Andrii Rosynskyi, Oleh Onofriichuk, Maksym Maltsev, Lesia Sorokina, Dmytro Dubovyk, Yevhenii Biloshchytskyi
article en

Abstract

The study proposes a simulation model of the interaction between the main participants in a construction and reconstruction investment project: the customer and the contractor. Both parties strive to satisfy their economic interests. However, prioritizing immediate gains exposes them to significant long-term losses. The priorities of the customer and the contractor in fulfilling contractual obligations are modeled using fuzzy logic inference algorithms. The inputs of these algorithms are determined by assessing the business partner’s value and the party’s market position. The model captures how fulfilling or failing to meet contractual obligations alters the parties’ attitudes and responsibilities. The developed simulation model assesses how the project outcome is affected by the parties’ subjective evaluations regarding the timing of work and payments, and the allocation of limited resources. The study also examines the proportions between the economic consequences of contractual breaches and substantiates the net intertemporal effect of financial resource savings. The analysis of the residential real estate market values and their variability, due to differences in technical conditions and location, provided the basis for determining the benefits and losses of underfinancing construction and reconstruction work. Assessing lost benefits from delayed delivery of finished construction objects considers expected and pessimistic scenarios, reflecting the price volatility in the primary and secondary housing markets.

Kyiv National University of Construction and Architecture (UA), International Humanitarian University (UA), European University (UA), Astana Medical University (KZ)
Openalex Percentile: Top 75%
BIM and Construction Integration
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.