On the construction rate of Geosynthetic-Reinforced and Pile-Supported Embankments
Geosynthetic-Reinforced and Pile-Supported Embankments are conventionally designed with simplified limit-equilibrium theories that prioritize ultimate limit state analysis. However, these methodologies exhibit a significant limitation in their inability to quantify the progressive settlement at the embankment crest during the construction phase, which is a critical phase in the occurrence of the soil arching mechanism. Recent advancements in the field have introduced a displacement-based mathematical model which can assess settlements, stresses, and geosynthetic forces during embankment construction with minimal computational effort. This paper compares full-scale test data with this mathematical model to examine the impact of embankment construction rate on the evolution of settlements during construction.
Authors
- Viviana Mangraviti (ORCID: https://orcid.org/0000-0003-3385-1883)
Publication Details
- Journal
- E3S Web of Conferences
- Published
- 2025-01-01
- DOI
- https://doi.org/10.1051/e3sconf/202564403005
- Citations
- 2
- Primary Topic
- Geotechnical Engineering and Soil Stabilization
- Type
- article
- Field-Weighted Citation Impact
- 1.91