Bridging the BIM Maturity Gap in Developing Country: A Change and Knowledge Management Framework for Enhancing Project Values

Despite the growing global adoption of Building Information Modeling (BIM), many construction companies, particularly in developing countries, struggle to transform BIM from a digital tool into a value creating capability. This study evaluates the persistent gap between BIM adoption and project performance, particularly in terms of time, cost, and quality. Drawing from a real case in an Indonesian construction company, this study applies a mixed-methods approach to evaluate BIM maturity, identify organizational barriers, and propose an integrated strategy for advancing maturity levels. Guided by the ADKAR change management framework and the SECI knowledge management framework, this study formulates strategic interventions aligned with the project values. The findings reveal that low BIM maturity stems not merely from technological constraints but from deeper organizational issues such as limited interdisciplinary collaboration, weak knowledge retention, and inconsistent digital policies. This study proposes a scalable framework for aligning BIM implementation with value creation in construction projects, providing actionable insights for companies in similar contexts globally.

Authors

Institutions

Publication Details

Journal
European Journal of Business Management and Research
Published
2025-08-20
DOI
https://doi.org/10.24018/ejbmr.2025.10.4.2736
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Bridging the BIM Maturity Gap in Developing Country: A Change and Knowledge Management Framework for Enhancing Project Values

Robby Kurniawan, Dedy Sushandoyo
European Journal of Business Management and Research
BIM and Construction Integration
article

Bridging the BIM Maturity Gap in Developing Country: A Change and Knowledge Management Framework for Enhancing Project Values

Robby Kurniawan, Dedy Sushandoyo
article en

Abstract

Despite the growing global adoption of Building Information Modeling (BIM), many construction companies, particularly in developing countries, struggle to transform BIM from a digital tool into a value creating capability. This study evaluates the persistent gap between BIM adoption and project performance, particularly in terms of time, cost, and quality. Drawing from a real case in an Indonesian construction company, this study applies a mixed-methods approach to evaluate BIM maturity, identify organizational barriers, and propose an integrated strategy for advancing maturity levels. Guided by the ADKAR change management framework and the SECI knowledge management framework, this study formulates strategic interventions aligned with the project values. The findings reveal that low BIM maturity stems not merely from technological constraints but from deeper organizational issues such as limited interdisciplinary collaboration, weak knowledge retention, and inconsistent digital policies. This study proposes a scalable framework for aligning BIM implementation with value creation in construction projects, providing actionable insights for companies in similar contexts globally.

European Journal of Business Management and ResearchVol. 10(4)
Bandung Institute of Technology (ID)
Openalex Percentile: Top 75%
BIM and Construction Integration
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.