General Factors, Dispute, and Human Factors Shaping Late Payment Issues in the Malaysian Construction Sector: A Path to Sustainability

The construction industry plays a significant role in Malaysia's economy; however, late payments remain a critical issue that disrupts projects and impacts financial stability. This study analyzes the primary causes of late payments in privately funded projects from the perspective of G7 contractors relying on the PAM Form of Contract and registered with the Construction Industry Development Board (CIDB). Questionnaires based on existing studies were distributed through random sampling using a quantitative methodology. The research focused on 15 key aspects categorized under three main headings: general characteristics, disputes, and human factors. Additionally, it considered post-pandemic impacts, which have often been overlooked in previous studies. Data analysis was conducted using SPSS and Smart PLS. The main variables identified include financial market volatility, inflation, employers withholding payments, ineffective financial management, lack of funds allocated for variation orders, banks refusing credit, conflicts over authorized payment amounts, certification delays, ambiguous contract terms, policy changes, and violations of prompt payment practices. After testing three hypotheses, recommendations were made for more equitable terms, such as implementing a Payment Security Bond and an associated contractual clause. By enhancing the financial sustainability and resilience of Malaysia's construction industry, the report offers practical strategies to improve payment procedures, benefiting contractors, legislators, and industry stakeholders.

Authors

Institutions

Publication Details

Journal
Architecture Image Studies
Published
2025-08-31
DOI
https://doi.org/10.62754/ais.v6i3.179
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

General Factors, Dispute, and Human Factors Shaping Late Payment Issues in the Malaysian Construction Sector: A Path to Sustainability

Asokan Vasudevan, Suleiman Ibrahim Shelash Mohammad, Zetty Pakir Mastan, Nurfarah Izzaty Mohd Azuan
Architecture Image Studies
Construction Project Management and Performance
article

General Factors, Dispute, and Human Factors Shaping Late Payment Issues in the Malaysian Construction Sector: A Path to Sustainability

Asokan Vasudevan, Suleiman Ibrahim Shelash Mohammad, Zetty Pakir Mastan, Nurfarah Izzaty Mohd Azuan
article en

Abstract

The construction industry plays a significant role in Malaysia's economy; however, late payments remain a critical issue that disrupts projects and impacts financial stability. This study analyzes the primary causes of late payments in privately funded projects from the perspective of G7 contractors relying on the PAM Form of Contract and registered with the Construction Industry Development Board (CIDB). Questionnaires based on existing studies were distributed through random sampling using a quantitative methodology. The research focused on 15 key aspects categorized under three main headings: general characteristics, disputes, and human factors. Additionally, it considered post-pandemic impacts, which have often been overlooked in previous studies. Data analysis was conducted using SPSS and Smart PLS. The main variables identified include financial market volatility, inflation, employers withholding payments, ineffective financial management, lack of funds allocated for variation orders, banks refusing credit, conflicts over authorized payment amounts, certification delays, ambiguous contract terms, policy changes, and violations of prompt payment practices. After testing three hypotheses, recommendations were made for more equitable terms, such as implementing a Payment Security Bond and an associated contractual clause. By enhancing the financial sustainability and resilience of Malaysia's construction industry, the report offers practical strategies to improve payment procedures, benefiting contractors, legislators, and industry stakeholders.

Architecture Image StudiesVol. 6(3)
INTI International University (MY), Zarqa University (JO), Shinawatra University (TH)
Zarqa University
Openalex Percentile: Top 73%
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.