Optimisation of Resource Allocation in Large-Scale Engineering Projects Using AI-Based Decision Models

In software development, varied decisions need to be made to ensure the fulfilment. Customers frequently seek a wide range of functions in large software projects, resulting in a vast set of requirements. Due to project timeframes and resource constraints, implementing all of the requirements is usually not possible. Setting priorities for a large number of requirements takes time and is challenging. As a result, an organised method of prioritising and subsequently choosing the primary set of needs based on several factors is required. Diverse techniques were available to prioritise the requirements effectively. But the accuracy and time consumption for Requirements Prioritisation were not optimised. Also, during the large-scale Requirements Prioritisation, multiple aspects such as time, cost are not considered. Therefore, three novel methods are proposed for enhancing the performance of large-scale Requirements Prioritisation with better accuracy and less time. Many resource plans were affected by the unexpected joining and leaving events of human resources, which may cause uncertainty. This uncertainty can also affect the quality of the project delivery. Appointing a developer to the first allotted task until the completion of the same may reduce the flexibility of human resources, even though the developer can do other tasks. Optimised Event-Based Scheduler handles this uncertainty and resource flexibility. It is pretty commonplace that we need more time for scheduling if the developer's record is enormous. Subsequently, the search space is also big, and in the long run, the resource allocation is not on time.

Authors

Publication Details

Journal
International Journal of Engineering Science and Information Technology
Published
2025-05-09
DOI
https://doi.org/10.52088/ijesty.v5i2.1390
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Optimisation of Resource Allocation in Large-Scale Engineering Projects Using AI-Based Decision Models

Jainish Roy, Muhidinov Ayubbek Nuritdinovich
International Journal of Engineering Science and Information Technology
BIM and Construction Integration
article

Optimisation of Resource Allocation in Large-Scale Engineering Projects Using AI-Based Decision Models

Jainish Roy, Muhidinov Ayubbek Nuritdinovich
article en

Abstract

In software development, varied decisions need to be made to ensure the fulfilment. Customers frequently seek a wide range of functions in large software projects, resulting in a vast set of requirements. Due to project timeframes and resource constraints, implementing all of the requirements is usually not possible. Setting priorities for a large number of requirements takes time and is challenging. As a result, an organised method of prioritising and subsequently choosing the primary set of needs based on several factors is required. Diverse techniques were available to prioritise the requirements effectively. But the accuracy and time consumption for Requirements Prioritisation were not optimised. Also, during the large-scale Requirements Prioritisation, multiple aspects such as time, cost are not considered. Therefore, three novel methods are proposed for enhancing the performance of large-scale Requirements Prioritisation with better accuracy and less time. Many resource plans were affected by the unexpected joining and leaving events of human resources, which may cause uncertainty. This uncertainty can also affect the quality of the project delivery. Appointing a developer to the first allotted task until the completion of the same may reduce the flexibility of human resources, even though the developer can do other tasks. Optimised Event-Based Scheduler handles this uncertainty and resource flexibility. It is pretty commonplace that we need more time for scheduling if the developer's record is enormous. Subsequently, the search space is also big, and in the long run, the resource allocation is not on time.

International Journal of Engineering Science and Information TechnologyVol. 5(2)
Openalex Percentile: Top 75%
BIM and Construction Integration
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Optimisation of Resource Allocation in Large-Scale Engineering Projects Using AI-Based Decision Models — Jainish Roy, Muhidinov Ayubbek Nuritdinovich · International Journal of Engineering Science and Information Technology (2025) | TGRS Research Map | TGRS