Contesting the imagined futures of infrastructure projects in Uganda

This paper critically examines the impacts of Chinese-backed infrastructure projects in Uganda, focusing on the tensions and conflicts surrounding their development. It highlights how the anticipated benefits of these projects are often contested and met with collective resistance. Drawing on interdisciplinary frameworks of state capacity and contentious politics, we analyze two key examples of Chinese-backed infrastructure projects in Uganda: the Kampala-Entebbe Expressway (KEE) and the Entebbe International Airport Expansion Project. Our central argument is that Uganda’s weak state capacity facilitates poorly planned and executed projects, leading to their failure to meet expectations. Discontent arises from the gap between the promised futures of these infrastructure projects and the disappointing realities they have produced. This disconnect can be attributed to systemic issues stemming from the state’s inability to effectively govern and manage the projects. The consequences of Uganda’s weak state capacity include widespread corruption, a lack of transparency and accountability, disregard for human rights, inadequate risk assessment, and poor adherence to regulations. Furthermore, limited community engagement and the failure to address local concerns have compounded the socio-political challenges facing the country. These issues are reflected in the growing public disillusionment, as evidenced by the recurring protests against the government.

Authors

Institutions

Publication Details

Journal
Cogent Social Sciences
Published
2025-08-30
DOI
https://doi.org/10.1080/23311886.2025.2551872
Primary Topic
International Development and Aid
Type
article
Field-Weighted Citation Impact
0.00

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Contesting the imagined futures of infrastructure projects in Uganda

Abdou Rahim Lema, Joel Odota
Cogent Social Sciences
International Development and Aid
article

Contesting the imagined futures of infrastructure projects in Uganda

Abdou Rahim Lema, Joel Odota
article en

Abstract

This paper critically examines the impacts of Chinese-backed infrastructure projects in Uganda, focusing on the tensions and conflicts surrounding their development. It highlights how the anticipated benefits of these projects are often contested and met with collective resistance. Drawing on interdisciplinary frameworks of state capacity and contentious politics, we analyze two key examples of Chinese-backed infrastructure projects in Uganda: the Kampala-Entebbe Expressway (KEE) and the Entebbe International Airport Expansion Project. Our central argument is that Uganda’s weak state capacity facilitates poorly planned and executed projects, leading to their failure to meet expectations. Discontent arises from the gap between the promised futures of these infrastructure projects and the disappointing realities they have produced. This disconnect can be attributed to systemic issues stemming from the state’s inability to effectively govern and manage the projects. The consequences of Uganda’s weak state capacity include widespread corruption, a lack of transparency and accountability, disregard for human rights, inadequate risk assessment, and poor adherence to regulations. Furthermore, limited community engagement and the failure to address local concerns have compounded the socio-political challenges facing the country. These issues are reflected in the growing public disillusionment, as evidenced by the recurring protests against the government.

Cogent Social SciencesVol. 11(1)
MTN (Uganda) (UG), Beijing Founder Electronics (China) (CN), Université de Montréal (CA)
United States Institute of Peace
Openalex Percentile: Top 53%
International Development and Aid
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Contesting the imagined futures of infrastructure projects in Uganda — Abdou Rahim Lema, Joel Odota · Cogent Social Sciences (2025) | TGRS Research Map | TGRS