Integrated design of experimentation and production schedules for customized semiconductor device fabrication services

When a low-volume order of customized fabrication process of semiconductor wafer is placed, experienced fabrication process designers develop a fabrication process sequence together with additional fabrication processes regarded as experimentation that ensures process quality depending on the condition of fabrication facilities, in advance of the actual fabrication process. In this study, an integrated design method of experimentation and production schedules for customized semiconductor wafers while considering the rationale of process designers. The scheduling system is implemented in the miniaturized semiconductor fabrication facilities at the National Institute of Advanced Industrial Science and Technology (AIST). A test fabrication processes was taken place, and the proposed method is applied to integrated scheduling, whose resulting schedule is compared with the actual test fabrication process.

Authors

Institutions

Publication Details

Journal
Procedia CIRP
Published
2025-01-01
DOI
https://doi.org/10.1016/j.procir.2025.08.151
Primary Topic
Manufacturing Process and Optimization
Type
article
Field-Weighted Citation Impact
0.00

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Integrated design of experimentation and production schedules for customized semiconductor device fabrication services

Junya Kurumida, Yoshiyuki Furukawa, Hitoshi Komoto, S. Ikeda
Procedia CIRP
Manufacturing Process and Optimization
article

Integrated design of experimentation and production schedules for customized semiconductor device fabrication services

Junya Kurumida, Yoshiyuki Furukawa, Hitoshi Komoto, S. Ikeda
article en

Abstract

When a low-volume order of customized fabrication process of semiconductor wafer is placed, experienced fabrication process designers develop a fabrication process sequence together with additional fabrication processes regarded as experimentation that ensures process quality depending on the condition of fabrication facilities, in advance of the actual fabrication process. In this study, an integrated design method of experimentation and production schedules for customized semiconductor wafers while considering the rationale of process designers. The scheduling system is implemented in the miniaturized semiconductor fabrication facilities at the National Institute of Advanced Industrial Science and Technology (AIST). A test fabrication processes was taken place, and the proposed method is applied to integrated scheduling, whose resulting schedule is compared with the actual test fabrication process.

Procedia CIRPVol. 136
National Institute of Advanced Industrial Science and Technology (JP), Advanced Institute of Industrial Technology (JP)
Japan Society for the Promotion of Science
Openalex Percentile: Top 68%
Manufacturing Process and Optimization
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Integrated design of experimentation and production schedules for customized semiconductor device fabrication services — Junya Kurumida, Yoshiyuki Furukawa, et al. · Procedia CIRP (2025) | TGRS Research Map | TGRS