Firm VRE Power generation in an All-Electric Grid The Case of Nova Scotia, Canada

This article builds upon a preliminary evaluation of firm variable renewable power generation solutions for the province of Nova Scotia, Canada. This showed that an optimized blend of variable renewable resources (VREs), battery storage (BESS), implicit storage (i.e., overbuilt and dynamically curtailed VREs) and small fraction of dispatchable e-fuel thermal generation could firmly meet the entire load requirements of the province 24/365 at an unsubsidized cost of 7.7 ¢/kWh in 2025 and at an anticipated cost of 4.5 ¢/kWh in 2050. This preliminary study considered no change in future provincial load size or shape. We present here the results of an enhanced, more robust evaluation that: (1) considers future (2050) load requirements transformed by a complete electrification of the province’s building and transportation sectors, (2) evaluates interconnection options with other Canadian provinces within existing energy and capacity allowances, and (3) provides a sensitivity analysis on the impact of future BESS capital and operational cost assumptions.

Authors

Institutions

Publication Details

Published
2025-06-08
DOI
https://doi.org/10.1109/pvsc59419.2025.11132500
Primary Topic
Electric Power System Optimization
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Firm VRE Power generation in an All-Electric Grid The Case of Nova Scotia, Canada

Christopher McNevin, Richard Perez, Réda Djebbar, Marc Pérez et al.
Electric Power System Optimization
article

Firm VRE Power generation in an All-Electric Grid The Case of Nova Scotia, Canada

Christopher McNevin, Richard Perez, Réda Djebbar, Marc Pérez, Ryan Kilpatrick, Laura Whelan
article en

Abstract

This article builds upon a preliminary evaluation of firm variable renewable power generation solutions for the province of Nova Scotia, Canada. This showed that an optimized blend of variable renewable resources (VREs), battery storage (BESS), implicit storage (i.e., overbuilt and dynamically curtailed VREs) and small fraction of dispatchable e-fuel thermal generation could firmly meet the entire load requirements of the province 24/365 at an unsubsidized cost of 7.7 ¢/kWh in 2025 and at an anticipated cost of 4.5 ¢/kWh in 2050. This preliminary study considered no change in future provincial load size or shape. We present here the results of an enhanced, more robust evaluation that: (1) considers future (2050) load requirements transformed by a complete electrification of the province’s building and transportation sectors, (2) evaluates interconnection options with other Canadian provinces within existing energy and capacity allowances, and (3) provides a sensitivity analysis on the impact of future BESS capital and operational cost assumptions.

Natural Resources Canada (CA)
Affordable and clean energy
Openalex Percentile: Top 78%
Electric Power System Optimization
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Firm VRE Power generation in an All-Electric Grid The Case of Nova Scotia, Canada — Christopher McNevin, Richard Perez, et al. · (2025) | TGRS Research Map | TGRS