This study examines the intricate task of predicting construction duration for drill-and-blast tunnels utilizing machine learning (ML) techniques. First, a comprehensive dataset (500 data points) encompassing 20 diverse parameters was compiled by constructing eight tunnels. After meticulous analysis, 17 of the 20 parameters were identified as crucial for training the algorithms. The overbreak and tunnel cross-section parameters were found to exert a significant influence on the tunnel construction duration. To enhance the predictive accuracy of the ML models, an intensive hyperparameter tuning process was conducted. The findings underscored the effectiveness of the Gaussian process regression model in capturing complex and nonlinear relationships, achieving an average R-squared of 0.89. Additionally, an ML-based graphical user interface (GUI) was developed to facilitate real‒time estimation of tunnel construction duration. This GUI not only enables initial predictions but also allows for dynamic updates throughout the construction phase, enhancing its practical utility.

Authors

Institutions

Publication Details

Journal
Scientific Reports
Published
2025-08-29
DOI
https://doi.org/10.1038/s41598-025-17455-7
Citations
4
Primary Topic
Tunneling and Rock Mechanics
Type
article
Field-Weighted Citation Impact
3.81

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Machine learning approaches for predicting the construction time of drill-and-blast tunnels

Arsalan Mahmoodzadeh, Abdulaziz S. Alghamdi, Nejib Ghazouani, Hamid Reza Nejati
4 citations
Scientific Reports
Tunneling and Rock Mechanics
3.81
article

Machine learning approaches for predicting the construction time of drill-and-blast tunnels

Arsalan Mahmoodzadeh, Abdulaziz S. Alghamdi, Nejib Ghazouani, Hamid Reza Nejati
article en
4 citations

Abstract

This study examines the intricate task of predicting construction duration for drill-and-blast tunnels utilizing machine learning (ML) techniques. First, a comprehensive dataset (500 data points) encompassing 20 diverse parameters was compiled by constructing eight tunnels. After meticulous analysis, 17 of the 20 parameters were identified as crucial for training the algorithms. The overbreak and tunnel cross-section parameters were found to exert a significant influence on the tunnel construction duration. To enhance the predictive accuracy of the ML models, an intensive hyperparameter tuning process was conducted. The findings underscored the effectiveness of the Gaussian process regression model in capturing complex and nonlinear relationships, achieving an average R-squared of 0.89. Additionally, an ML-based graphical user interface (GUI) was developed to facilitate real‒time estimation of tunnel construction duration. This GUI not only enables initial predictions but also allows for dynamic updates throughout the construction phase, enhancing its practical utility.

Scientific ReportsVol. 15(1)
Northern Border University (SA), Tarbiat Modares University (IR), Lebanese French University (IQ), University of Tabuk (SA)
Northern Border University
Sustainable cities and communities
Openalex Percentile: Top 7%
Tunneling and Rock Mechanics
3.81
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Machine learning approaches for predicting the construction time of drill-and-blast tunnels — Arsalan Mahmoodzadeh, Abdulaziz S. Alghamdi, et al. · Scientific Reports (2025) | TGRS Research Map | TGRS