Project Task – Resource Optimization using Eigen Vector Analysis: A Case Study of a 3-Bedroom Bungalow Construction

Construction projects involve complex task-resource interactions, making optimization crucial for timely completion and cost-effectiveness.This study applies eigenvector analysis to optimize taskresource allocation in construction projects, using a 3-bedroom bungalow case study.A matrix was developed representing tasks to be performed against resource utilization and eigenvector centrality measures applied to identify critical resources and tasks.The analysis revealed key resources driving the project timelines, enabling efficient allocation and minimizing delays.By prioritizing tasks and resources based on their centrality scores, project managers can streamline workflows, reduce idle time, and enhance productivity.The results demonstrate significant improvements in resource utilization, project duration, and overall efficiency.This approach provides valuable insights for construction project managers, enabling data-driven decision-making and optimized resource allocation.The study contributes to the growing body of research on applying network analysis techniques to construction project management, offering a practical tool for improving project outcomes.By leveraging eigenvector analysis, construction professionals can better navigate complex project dynamics, mitigate risks, and deliver projects on time and within budget.

Publication Details

Journal
Texila international journal of management
Published
2025-08-29
DOI
https://doi.org/10.21522/tijmg.2015.11.02.art012
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Project Task – Resource Optimization using Eigen Vector Analysis: A Case Study of a 3-Bedroom Bungalow Construction

Texila international journal of management
BIM and Construction Integration
article

Project Task – Resource Optimization using Eigen Vector Analysis: A Case Study of a 3-Bedroom Bungalow Construction

article en

Abstract

Construction projects involve complex task-resource interactions, making optimization crucial for timely completion and cost-effectiveness.This study applies eigenvector analysis to optimize taskresource allocation in construction projects, using a 3-bedroom bungalow case study.A matrix was developed representing tasks to be performed against resource utilization and eigenvector centrality measures applied to identify critical resources and tasks.The analysis revealed key resources driving the project timelines, enabling efficient allocation and minimizing delays.By prioritizing tasks and resources based on their centrality scores, project managers can streamline workflows, reduce idle time, and enhance productivity.The results demonstrate significant improvements in resource utilization, project duration, and overall efficiency.This approach provides valuable insights for construction project managers, enabling data-driven decision-making and optimized resource allocation.The study contributes to the growing body of research on applying network analysis techniques to construction project management, offering a practical tool for improving project outcomes.By leveraging eigenvector analysis, construction professionals can better navigate complex project dynamics, mitigate risks, and deliver projects on time and within budget.

Texila international journal of managementVol. 11(02)
Decent work and economic growth
Openalex Percentile: Top 76%
BIM and Construction Integration
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Project Task – Resource Optimization using Eigen Vector Analysis: A Case Study of a 3-Bedroom Bungalow Construction · Texila international journal of management (2025) | TGRS Research Map | TGRS