Monte Carlo simulation for real-world energy yield analysis of car park solar PV system installations in harsh environments

• The significant contributions of the current work are highlighted as follows: • The PV system produced 1,506.17 MWh—24.4% below the PVsyst forecast, highlighting a significant performance gap. • Integration of PVsyst and Monte Carlo simulations confirmed that the actual output fell outside the 95% confidence interval, indicating severe underperformance. • Key loss drivers included dust accumulation, high temperatures, and system degradation, which were not fully accounted for in the simulation. • KPI Deviation: Actual PR (64.5%) and CUF (14.5%) were well below simulated values (81.64% and 18.9%), revealing real-world inefficiencies. • A 486 MWh shortfall beyond modeled losses signals the need for improved simulation accuracy and system calibration. Maintaining a reliable power supply despite uncertainties from failures, renewable fluctuations, and load growth is vital for electricity infrastructure. Assessing reliability helps identify operational weaknesses, yet evolving system variability demands advanced analytical tools. This study presents a comprehensive performance evaluation of a 1,179 kWp grid-tied car park solar photovoltaic (PV) installation in Abqaiq, Saudi Arabia, designed to meet daytime consumption for industrial buildings under harsh desert-coastal environmental conditions. Using PVsyst simulation software, real-time monitoring data, and Monte Carlo simulation techniques, the research investigates discrepancies between modelled and actual system performance during the plant’s first operational year. The actual annual energy yield was measured at 1,506.17 MWh approximately 24.4% below the PVsyst predicted P50 value of 1,992 MWh. Key performance indicators, including Performance Ratio (PR) and Capacity Utilization Factor (CUF), were also significantly lower than expected, at 64.5% and 14.5%, respectively, compared to simulated values of 81.64% and 18.9%. Monte Carlo analysis, using 10,000 iterations, confirmed a low probability of the actual output occurring under the simulation’s standard variability assumptions, indicating severe underperformance. The study identifies real-world challenges such as excessive dust accumulation, elevated ambient temperatures, and system degradation as primary contributors to the energy shortfall. The integration of deterministic simulation with probabilistic modelling provides a robust methodology for yield prediction and risk assessment. The findings underscore the need for improved forecasting accuracy, routine performance diagnostics, and adaptive system design tailored to extreme climates. The integration of confidence interval analysis and probabilistic modelling provides a deeper understanding of yield deviations and system underperformance, offering a replicable methodology for performance validation in extreme environments. This approach supports improved planning, investment evaluation, and maintenance strategies for large-scale PV systems exposed to challenging climatic conditions.

Authors

Institutions

Publication Details

Journal
Results in Engineering
Published
2025-08-29
DOI
https://doi.org/10.1016/j.rineng.2025.106996
Citations
1
Primary Topic
Vehicle emissions and performance
Type
article
Field-Weighted Citation Impact
0.68
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Monte Carlo simulation for real-world energy yield analysis of car park solar PV system installations in harsh environments

Saad Mekhilef, M.A. Alghoul, Muhammad Aqil, Hazlie Mokhlis et al.
1 citations
Results in Engineering
Vehicle emissions and performance
0.68
article

Monte Carlo simulation for real-world energy yield analysis of car park solar PV system installations in harsh environments

Saad Mekhilef, M.A. Alghoul, Muhammad Aqil, Hazlie Mokhlis, Abdulrhman Klifa Al-Hanoot, Manal Alhanut
article en
1 citations

Abstract

• The significant contributions of the current work are highlighted as follows: • The PV system produced 1,506.17 MWh—24.4% below the PVsyst forecast, highlighting a significant performance gap. • Integration of PVsyst and Monte Carlo simulations confirmed that the actual output fell outside the 95% confidence interval, indicating severe underperformance. • Key loss drivers included dust accumulation, high temperatures, and system degradation, which were not fully accounted for in the simulation. • KPI Deviation: Actual PR (64.5%) and CUF (14.5%) were well below simulated values (81.64% and 18.9%), revealing real-world inefficiencies. • A 486 MWh shortfall beyond modeled losses signals the need for improved simulation accuracy and system calibration. Maintaining a reliable power supply despite uncertainties from failures, renewable fluctuations, and load growth is vital for electricity infrastructure. Assessing reliability helps identify operational weaknesses, yet evolving system variability demands advanced analytical tools. This study presents a comprehensive performance evaluation of a 1,179 kWp grid-tied car park solar photovoltaic (PV) installation in Abqaiq, Saudi Arabia, designed to meet daytime consumption for industrial buildings under harsh desert-coastal environmental conditions. Using PVsyst simulation software, real-time monitoring data, and Monte Carlo simulation techniques, the research investigates discrepancies between modelled and actual system performance during the plant’s first operational year. The actual annual energy yield was measured at 1,506.17 MWh approximately 24.4% below the PVsyst predicted P50 value of 1,992 MWh. Key performance indicators, including Performance Ratio (PR) and Capacity Utilization Factor (CUF), were also significantly lower than expected, at 64.5% and 14.5%, respectively, compared to simulated values of 81.64% and 18.9%. Monte Carlo analysis, using 10,000 iterations, confirmed a low probability of the actual output occurring under the simulation’s standard variability assumptions, indicating severe underperformance. The study identifies real-world challenges such as excessive dust accumulation, elevated ambient temperatures, and system degradation as primary contributors to the energy shortfall. The integration of deterministic simulation with probabilistic modelling provides a robust methodology for yield prediction and risk assessment. The findings underscore the need for improved forecasting accuracy, routine performance diagnostics, and adaptive system design tailored to extreme climates. The integration of confidence interval analysis and probabilistic modelling provides a deeper understanding of yield deviations and system underperformance, offering a replicable methodology for performance validation in extreme environments. This approach supports improved planning, investment evaluation, and maintenance strategies for large-scale PV systems exposed to challenging climatic conditions.

Results in EngineeringVol. 28
King Fahd University of Petroleum and Minerals (SA), University of Malaya (MY), King Faisal University (SA), Swinburne University of Technology (AU)
Affordable and clean energy
Openalex Percentile: Top 26%
Vehicle emissions and performance
0.68
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.