Multi-Objective Optimization of Tower Crane Layout Planning in Modular Integrated Construction Considering Efficiency, Cost, and Lifting Safety

With the increase of modular integrated construction (MiC) projects, the planning of tower crane layout (TCLP) becomes vitally essential to achieve a balance among multiple goals, such as efficiency, economy, and safety. However, existing TCLP studies are usually formed as single-objective optimization based on total lifting time for conventional construction sites. There should be trade-offs among multiple goals, especially safety. In addition, the heavier components of MiC, requiring cranes with larger lifting capacity, pose a challenge in terms of cost. Therefore, it is necessary to propose a more general and reasonable model to assist managers in making better decisions for TCLP. This study aims to develop a multi-objective optimization model with efficiency, cost, and lifting safety considerations for MiC projects. Firstly, based on literature research and accident statistics, the total transportation time, total cost of tower cranes, and total lifting moment are chosen as the three optimization objectives. Then, the improved three-objective optimization model, considering module positioning time and separate movement features of tower cranes, is proposed. To solve the proposed multi-objective problem, the evolutionary algorithm NSGA-III is used for solutions. The proposed model can provide a series of trade-off solutions for efficiency, cost, and safety, representing different combinations of crane location, supply point location, and orientation. A MiC project in Hong Kong is studied as a case to verify the feasibility and effectiveness of the proposed model. The results show that the proposed model can determine the optimized layout plan with minimum time, cost, and lifting moment by locating the tower crane point, supply point, and supply point orientation. Disregarding the orientation of the supply point would result in an additional 18.2% transportation time, leading to increased costs. Compared to the original layout scheme, the developed model can save up to 41.7% in transportation time and improve safety by 27.4%.

Authors

Publication Details

Journal
Kalpa publications in computing
Published
2025-08-28
DOI
https://doi.org/10.29007/tk1g
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Multi-Objective Optimization of Tower Crane Layout Planning in Modular Integrated Construction Considering Efficiency, Cost, and Lifting Safety

Roy Dong Wang, Rongyan Li, Hung-Lin Chi, Tarek Zayed et al.
Kalpa publications in computing
BIM and Construction Integration
article

Multi-Objective Optimization of Tower Crane Layout Planning in Modular Integrated Construction Considering Efficiency, Cost, and Lifting Safety

Roy Dong Wang, Rongyan Li, Hung-Lin Chi, Tarek Zayed, Bo Xiao, Fangzheng Li
article en

Abstract

With the increase of modular integrated construction (MiC) projects, the planning of tower crane layout (TCLP) becomes vitally essential to achieve a balance among multiple goals, such as efficiency, economy, and safety. However, existing TCLP studies are usually formed as single-objective optimization based on total lifting time for conventional construction sites. There should be trade-offs among multiple goals, especially safety. In addition, the heavier components of MiC, requiring cranes with larger lifting capacity, pose a challenge in terms of cost. Therefore, it is necessary to propose a more general and reasonable model to assist managers in making better decisions for TCLP. This study aims to develop a multi-objective optimization model with efficiency, cost, and lifting safety considerations for MiC projects. Firstly, based on literature research and accident statistics, the total transportation time, total cost of tower cranes, and total lifting moment are chosen as the three optimization objectives. Then, the improved three-objective optimization model, considering module positioning time and separate movement features of tower cranes, is proposed. To solve the proposed multi-objective problem, the evolutionary algorithm NSGA-III is used for solutions. The proposed model can provide a series of trade-off solutions for efficiency, cost, and safety, representing different combinations of crane location, supply point location, and orientation. A MiC project in Hong Kong is studied as a case to verify the feasibility and effectiveness of the proposed model. The results show that the proposed model can determine the optimized layout plan with minimum time, cost, and lifting moment by locating the tower crane point, supply point, and supply point orientation. Disregarding the orientation of the supply point would result in an additional 18.2% transportation time, leading to increased costs. Compared to the original layout scheme, the developed model can save up to 41.7% in transportation time and improve safety by 27.4%.

Kalpa publications in computingVol. 22
Openalex Percentile: Top 76%
BIM and Construction Integration
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.