A Simulation-Based Genetic Algorithm Schedule Optimization Method for Bridge Construction

Off-site construction has become widely acknowledged for its advantages, such as saving time, enabling faster assembly, and being cost-efficient. The sector's rapid growth has driven the demand for more advanced and effective methods of construction scheduling. Construction scheduling is naturally complicated due to the numerous constraints it involves, including those connected to workforce and resource availability. Conventional approaches, like the Critical Path Method (CPM), fail to account for multiple constraints, which limits their effectiveness in practical project scenarios. This research presents a simulation-based Genetic Algorithm (S-GA) approach to develop optimal construction schedules while accounting for constraints in labour and resources. Reducing the total project duration is the objective of proposed method. The proposed S-GA framework enhances the ability to manage scheduling across all construction phases. A real-world case which contains a prefabricated bridge with 6 spans was conducted to assess the method. For comparison, traditional methods and the evolution algorithm (EA) were adopted, and the findings indicated that S-GA not only produced superior construction schedules but also operated with less computational time. As a result, the proposed approach offers an advanced scheduling method that is applicable to real-world construction projects.

Authors

Publication Details

Journal
Kalpa publications in computing
Published
2025-08-28
DOI
https://doi.org/10.29007/dnwf
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

A Simulation-Based Genetic Algorithm Schedule Optimization Method for Bridge Construction

Khoa N. Le, A. Butera, Vivian W.Y. Tam, Wenchi Shou et al.
Kalpa publications in computing
BIM and Construction Integration
article

A Simulation-Based Genetic Algorithm Schedule Optimization Method for Bridge Construction

Khoa N. Le, A. Butera, Vivian W.Y. Tam, Wenchi Shou, Yuan Yao, Jun Wang
article en

Abstract

Off-site construction has become widely acknowledged for its advantages, such as saving time, enabling faster assembly, and being cost-efficient. The sector's rapid growth has driven the demand for more advanced and effective methods of construction scheduling. Construction scheduling is naturally complicated due to the numerous constraints it involves, including those connected to workforce and resource availability. Conventional approaches, like the Critical Path Method (CPM), fail to account for multiple constraints, which limits their effectiveness in practical project scenarios. This research presents a simulation-based Genetic Algorithm (S-GA) approach to develop optimal construction schedules while accounting for constraints in labour and resources. Reducing the total project duration is the objective of proposed method. The proposed S-GA framework enhances the ability to manage scheduling across all construction phases. A real-world case which contains a prefabricated bridge with 6 spans was conducted to assess the method. For comparison, traditional methods and the evolution algorithm (EA) were adopted, and the findings indicated that S-GA not only produced superior construction schedules but also operated with less computational time. As a result, the proposed approach offers an advanced scheduling method that is applicable to real-world construction projects.

Kalpa publications in computingVol. 22
Openalex Percentile: Top 76%
BIM and Construction Integration
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

A Simulation-Based Genetic Algorithm Schedule Optimization Method for Bridge Construction — Khoa N. Le, A. Butera, et al. · Kalpa publications in computing (2025) | TGRS Research Map | TGRS