Characteristic Curves for Multiple‐Inspector Sampling Plans with Inspection Errors

ABSTRACT Classical single sampling plans (SSPs) are designed assuming that product units sampled from a lot are inspected by one inspector, in the absence or presence of inspection errors. The scenario becomes more complicated when SSPs are applied assuming that multiple inspectors operate in parallel on the same sample, as occasionally required in high‐value‐added or highly customized industries (e.g., aerospace, defence, luxury goods, etc.). Current literature lacks a rigorous formulation of operating characteristic (OC) curves for SSPs involving multiple inspectors, who independently perform conformity assessments on the same product units. This paper addresses this gap by extending classical OC‐curve theory to scenarios involving multiple inspectors, each characterized by distinct individual error rates (i.e., probabilities of misclassifying conforming units as defective ones and vice versa). The resulting analytical models are flexible enough to incorporate alternative aggregation criteria and sequences for consolidating individual inspectors' conformity assessments into an overall lot‐disposition decision. Both hypergeometric (Type‐A) and binomial (Type‐B) formulations of the multiple‐inspector OC curve are presented. Results show that in the absence of inspection errors, the multiple‐inspector OC curve converges to the classical single‐inspector curve. Moreover, aggregation criteria may significantly influence the OC‐curve shape: a majority aggregation criterion yields robust OC curves, even under moderate to high error rates, whereas an unanimity criterion produces excessively severe OC curves, unless inspection errors are very low. Overall, the proposed analytical framework enables a realistic design of SSPs, particularly beneficial for sectors demanding highly reliable inspections.

Authors

Institutions

Publication Details

Journal
Quality and Reliability Engineering International
Published
2025-08-28
DOI
https://doi.org/10.1002/qre.70058
Primary Topic
Advanced Statistical Process Monitoring
Type
article
Field-Weighted Citation Impact
0.00

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Characteristic Curves for Multiple‐Inspector Sampling Plans with Inspection Errors

Lorenzo Ferrara, Fiorenzo Franceschini, Domenico Maisano
Quality and Reliability Engineering International
Advanced Statistical Process Monitoring
article

Characteristic Curves for Multiple‐Inspector Sampling Plans with Inspection Errors

Lorenzo Ferrara, Fiorenzo Franceschini, Domenico Maisano
article en

Abstract

ABSTRACT Classical single sampling plans (SSPs) are designed assuming that product units sampled from a lot are inspected by one inspector, in the absence or presence of inspection errors. The scenario becomes more complicated when SSPs are applied assuming that multiple inspectors operate in parallel on the same sample, as occasionally required in high‐value‐added or highly customized industries (e.g., aerospace, defence, luxury goods, etc.). Current literature lacks a rigorous formulation of operating characteristic (OC) curves for SSPs involving multiple inspectors, who independently perform conformity assessments on the same product units. This paper addresses this gap by extending classical OC‐curve theory to scenarios involving multiple inspectors, each characterized by distinct individual error rates (i.e., probabilities of misclassifying conforming units as defective ones and vice versa). The resulting analytical models are flexible enough to incorporate alternative aggregation criteria and sequences for consolidating individual inspectors' conformity assessments into an overall lot‐disposition decision. Both hypergeometric (Type‐A) and binomial (Type‐B) formulations of the multiple‐inspector OC curve are presented. Results show that in the absence of inspection errors, the multiple‐inspector OC curve converges to the classical single‐inspector curve. Moreover, aggregation criteria may significantly influence the OC‐curve shape: a majority aggregation criterion yields robust OC curves, even under moderate to high error rates, whereas an unanimity criterion produces excessively severe OC curves, unless inspection errors are very low. Overall, the proposed analytical framework enables a realistic design of SSPs, particularly beneficial for sectors demanding highly reliable inspections.

Quality and Reliability Engineering InternationalVol. 41(8)
Politecnico di Torino (IT)
Politecnico di Torino, European Commission
Openalex Percentile: Top 78%
Advanced Statistical Process Monitoring
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.