Analisis Efektivitas Predictive Maintenance dalam Mengoptimalkan Cost Avoidance pada Final Drive Komatsu PC200-8

This study analyzes the effectiveness of implementing predictive maintenance (PdM) on the final drive components of the Komatsu PC200-8 unit at PT. Antareja Mahada Makmur, Site PT. Multi Harapan Utama, East Kalimantan, in an effort to reduce downtime and operational losses. Before the implementation of PdM in 2022, there were 12 repair cases for the final drive with a total downtime of 772.1 hours, repair costs amounting to IDR 310.6 million, rental income loss of IDR 208.03 million, and total losses of IDR 518.63 million. In 2023, during the PdM transition phase, the number of cases decreased to 4, with a total loss of IDR 252.05 million, although downtime remained high (714.6 hours) due to the limited scope of PdM implementation on certain units and components. In 2024, with full PdM implementation, the number of repair cases decreased to 5, with total downtime of only 96 hours and losses of IDR 45.75 million. The cost of PdM implementation for the year was only IDR 21.9 million. As of July 2025, no further damage to the final drive has been recorded, demonstrating a significant improvement in equipment reliability. The reduction in total losses from 2022 to 2024 amounted to IDR 472.88 million, indicating PdM’s effectiveness in avoiding significant costs through condition monitoring methods such as oil analysis, magnetic plug rating, thermal inspection, and oil leak testing (floating seal). The findings of this study confirm that PdM is effective in reducing downtime, repair costs, and enhancing asset management in the mining sector. It also improves equipment reliability and overall operational efficiency, proving PdM to be a successful strategy in reducing losses, increasing productivity, and supporting the sustainability of company operations.

Authors

Institutions

Publication Details

Journal
Venus Jurnal Publikasi Rumpun Ilmu Teknik 
Published
2025-08-28
DOI
https://doi.org/10.61132/venus.v3i4.1059
Primary Topic
Management and Optimization Techniques
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Analisis Efektivitas Predictive Maintenance dalam Mengoptimalkan Cost Avoidance pada Final Drive Komatsu PC200-8

Mad Yusup, Purbawati Purbawati, Diyaa Aaisyah Salmaa Putri Atmaja, Ida Rosanti et al.
Venus Jurnal Publikasi Rumpun Ilmu Teknik 
Management and Optimization Techniques
article

Analisis Efektivitas Predictive Maintenance dalam Mengoptimalkan Cost Avoidance pada Final Drive Komatsu PC200-8

Mad Yusup, Purbawati Purbawati, Diyaa Aaisyah Salmaa Putri Atmaja, Ida Rosanti, Esa Cahya Kartika
article en

Abstract

This study analyzes the effectiveness of implementing predictive maintenance (PdM) on the final drive components of the Komatsu PC200-8 unit at PT. Antareja Mahada Makmur, Site PT. Multi Harapan Utama, East Kalimantan, in an effort to reduce downtime and operational losses. Before the implementation of PdM in 2022, there were 12 repair cases for the final drive with a total downtime of 772.1 hours, repair costs amounting to IDR 310.6 million, rental income loss of IDR 208.03 million, and total losses of IDR 518.63 million. In 2023, during the PdM transition phase, the number of cases decreased to 4, with a total loss of IDR 252.05 million, although downtime remained high (714.6 hours) due to the limited scope of PdM implementation on certain units and components. In 2024, with full PdM implementation, the number of repair cases decreased to 5, with total downtime of only 96 hours and losses of IDR 45.75 million. The cost of PdM implementation for the year was only IDR 21.9 million. As of July 2025, no further damage to the final drive has been recorded, demonstrating a significant improvement in equipment reliability. The reduction in total losses from 2022 to 2024 amounted to IDR 472.88 million, indicating PdM’s effectiveness in avoiding significant costs through condition monitoring methods such as oil analysis, magnetic plug rating, thermal inspection, and oil leak testing (floating seal). The findings of this study confirm that PdM is effective in reducing downtime, repair costs, and enhancing asset management in the mining sector. It also improves equipment reliability and overall operational efficiency, proving PdM to be a successful strategy in reducing losses, increasing productivity, and supporting the sustainability of company operations.

Venus Jurnal Publikasi Rumpun Ilmu Teknik Vol. 3(4)
Universitas Nahdlatul Ulama Indonesia (ID)
Openalex Percentile: Top 66%
Management and Optimization Techniques
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Analisis Efektivitas Predictive Maintenance dalam Mengoptimalkan Cost Avoidance pada Final Drive Komatsu PC200-8 — Mad Yusup, Purbawati Purbawati, et al. · Venus Jurnal Publikasi Rumpun Ilmu Teknik  (2025) | TGRS Research Map | TGRS