Electrical Load Forecasting Using Ant Algorithm With Short Forecast Time

The characteristics of the demand for electrical energy sometimes make the effort difficult to meet. Forecasting load growth and efforts to satisfactorily meet daily and annual load cycles are two difficulties that must be overcome. The average growth of electricity consumption in Indonesia is increasing every year. Given to build a power plant takes 8 to 10 years, then the system planners should look at the possibilities of the development of Power Systems 10 to 20 years ahead. This is necessary so that there is time to estimate and improve planning in a long-term perspective.The need for electrical energy consumption can also be used as an indicator of the trend in which the development of the sector or area is moving. The increasing need for electric power is certainly to be anticipated by providing a more adequate electrical system both in number and quality in the future. Thus, in electrical a system is needed forecasting (estimate) well to determine the need for electricity within a certain period of time either short-term, medium-term or long-term and the need for peak loads to reduce environmental uncertainty.

Authors

Institutions

Publication Details

Journal
Proceeding of International Conference on Science and Technology UISU.
Published
2024-11-26
DOI
https://doi.org/10.30743/ppn9v604
Primary Topic
Energy Load and Power Forecasting
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Electrical Load Forecasting Using Ant Algorithm With Short Forecast Time

Mahrizal Masri, Muhammad Fadlan Siregar, Helma Widya, Hermansyah Alam
Proceeding of International Conference on Science and Technology UISU.
Energy Load and Power Forecasting
article

Electrical Load Forecasting Using Ant Algorithm With Short Forecast Time

Mahrizal Masri, Muhammad Fadlan Siregar, Helma Widya, Hermansyah Alam
article en

Abstract

The characteristics of the demand for electrical energy sometimes make the effort difficult to meet. Forecasting load growth and efforts to satisfactorily meet daily and annual load cycles are two difficulties that must be overcome. The average growth of electricity consumption in Indonesia is increasing every year. Given to build a power plant takes 8 to 10 years, then the system planners should look at the possibilities of the development of Power Systems 10 to 20 years ahead. This is necessary so that there is time to estimate and improve planning in a long-term perspective.The need for electrical energy consumption can also be used as an indicator of the trend in which the development of the sector or area is moving. The increasing need for electric power is certainly to be anticipated by providing a more adequate electrical system both in number and quality in the future. Thus, in electrical a system is needed forecasting (estimate) well to determine the need for electricity within a certain period of time either short-term, medium-term or long-term and the need for peak loads to reduce environmental uncertainty.

Proceeding of International Conference on Science and Technology UISU.
Jakarta State Polytechnic (ID), North Sumatra Islamic University (ID), Medan Area University (ID)
Openalex Percentile: Top 71%
Energy Load and Power Forecasting
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.