ANALYSIS OF HEAVY EQUIPMENT USAGE FOR INLET CONDUIT WORK ON CIJUREY DAM PROJECT PACKAGE 1

Earth excavation work cannot be separated from the use of heavy equipment, where job performance is expected to be completed in a fast time at a minimum cost. Thus, it is necessary to calculate tool productivity to determine the combination of heavy equipment usage in a job. The productivity of heavy equipment can be determined based on the cycle time of working tools, where the cycle time of each tool has a difference depending on the size of the tool and the type of material being worked on. The method used by comparing productivity between heavy equipment is calculated by observing the cycle time of heavy equipment in completing the work. The productivity comparison obtained is used to calculate the most efficient tool requirements in a job which then calculates the costs that need to be incurred to complete a job. In this case, the efficiency of the combination of heavy equipment fleets can be done if the productivity between tools is far enough adrift. This efficiency value can affect the length of working time or equipment costs, or both. In this study, the efficiency of heavy equipment in the earth excavation work of the Cijurey Dam inlet area can be done through changes in the combination of heavy equipment fleets which originally used two excavators and four dump trucks to three excavators and four dump trucks. The results of heavy equipment efficiency show an acceleration of work time and a reduction in cost expenditure, the new fleet change of heavy equipment is using fleet 3 which can streamline time up to 80 working hours and reduces costs by Rp97,543,226.67.

Authors

Institutions

Publication Details

Journal
Jurnal Ilmiah Teknik Sipil
Published
2024-09-30
DOI
https://doi.org/10.24843/jits.2024.v28.i02.p07
Primary Topic
Oil and Gas Production Techniques
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

ANALYSIS OF HEAVY EQUIPMENT USAGE FOR INLET CONDUIT WORK ON CIJUREY DAM PROJECT PACKAGE 1

Ekodjati Tunggulgeni, Anasya Arsita Laksmi, Ega Dwi Prasetyo
1 links
Jurnal Ilmiah Teknik Sipil
Oil and Gas Production Techniques
article

ANALYSIS OF HEAVY EQUIPMENT USAGE FOR INLET CONDUIT WORK ON CIJUREY DAM PROJECT PACKAGE 1

Ekodjati Tunggulgeni, Anasya Arsita Laksmi, Ega Dwi Prasetyo
article en

Abstract

Earth excavation work cannot be separated from the use of heavy equipment, where job performance is expected to be completed in a fast time at a minimum cost. Thus, it is necessary to calculate tool productivity to determine the combination of heavy equipment usage in a job. The productivity of heavy equipment can be determined based on the cycle time of working tools, where the cycle time of each tool has a difference depending on the size of the tool and the type of material being worked on. The method used by comparing productivity between heavy equipment is calculated by observing the cycle time of heavy equipment in completing the work. The productivity comparison obtained is used to calculate the most efficient tool requirements in a job which then calculates the costs that need to be incurred to complete a job. In this case, the efficiency of the combination of heavy equipment fleets can be done if the productivity between tools is far enough adrift. This efficiency value can affect the length of working time or equipment costs, or both. In this study, the efficiency of heavy equipment in the earth excavation work of the Cijurey Dam inlet area can be done through changes in the combination of heavy equipment fleets which originally used two excavators and four dump trucks to three excavators and four dump trucks. The results of heavy equipment efficiency show an acceleration of work time and a reduction in cost expenditure, the new fleet change of heavy equipment is using fleet 3 which can streamline time up to 80 working hours and reduces costs by Rp97,543,226.67.

Jurnal Ilmiah Teknik SipilVol. 28(2)
Indonesia Defense University (ID)
Openalex Percentile: Top 61%
Oil and Gas Production Techniques
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.