<p>The 2024 state garden exhibition in Wangen im Allgäu saw the redevelopment of a former spinning mill and its industrialised and later neglected surroundings into an area for local recreation, and at the same time return them into a more natural state.</p><p>The idea of re-claiming nature extended to the bridge design. First, untreated timber was chosen as primary material from a pool of materials investigated. Secondly, the bridges initially served construction traffic only to be “returned” to their permanent use as pedestrian- and cycling crossings. This established an immediate relationship to the evolving site, where nature was quick to reclaim the riverbanks and surroundings.</p><p>For the structure, glued laminated beams act in composite with the concrete deck. At the abutments, the concrete wraps around the structural timber and continues monolithically into the foundations. Like an inlay to the concrete and away from the moist abutments, the timber is carefully protected from the elements. Fully integral, longevity is all but assured.</p><p>Life-cycle assessments continuously performed throughout the design process and upon completion showed very favourable results when compared to similar span bridges.</p>

Authors

Institutions

Publication Details

Published
2025-08-27
DOI
https://doi.org/10.24904/footbridge2025.46
Primary Topic
Ecology, Conservation, and Geographical Studies
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Returned to a Natural State - Two Timber-Concrete-Composite Bridges in Wangen Im Allgäu

Daniel Gebreiter, Julia Schüler
Ecology, Conservation, and Geographical Studies
article

Returned to a Natural State - Two Timber-Concrete-Composite Bridges in Wangen Im Allgäu

Daniel Gebreiter, Julia Schüler
article en

Abstract

<p>The 2024 state garden exhibition in Wangen im Allgäu saw the redevelopment of a former spinning mill and its industrialised and later neglected surroundings into an area for local recreation, and at the same time return them into a more natural state.</p><p>The idea of re-claiming nature extended to the bridge design. First, untreated timber was chosen as primary material from a pool of materials investigated. Secondly, the bridges initially served construction traffic only to be “returned” to their permanent use as pedestrian- and cycling crossings. This established an immediate relationship to the evolving site, where nature was quick to reclaim the riverbanks and surroundings.</p><p>For the structure, glued laminated beams act in composite with the concrete deck. At the abutments, the concrete wraps around the structural timber and continues monolithically into the foundations. Like an inlay to the concrete and away from the moist abutments, the timber is carefully protected from the elements. Fully integral, longevity is all but assured.</p><p>Life-cycle assessments continuously performed throughout the design process and upon completion showed very favourable results when compared to similar span bridges.</p>

Schlaich Bergermann und Partner (Germany) (DE)
Openalex Percentile: Top 77%
Ecology, Conservation, and Geographical Studies
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Returned to a Natural State - Two Timber-Concrete-Composite Bridges in Wangen Im Allgäu — Daniel Gebreiter, Julia Schüler · (2025) | TGRS Research Map | TGRS