Restoration of the Rochers Noirs Viaduc

<p>The diagnosis of the Rochers Noirs Viaduct, listed as a Heritage Building in 2000 and closed to traffic since 2006, revealed some significant defects in the suspension cables that shall be completely renewed.</p><p>Furthermore, the upper steel decking, only designed to support personnel maintaining the original railway line, is unfit for future use and shall also be fully replaced to enable the re-opening of the viaduct for soft mobilities. Some rehabilitation works also need to be undertaken on the masonry and ironworking. As of November 2023, the deck is supported by a temporary suspension, the old suspension has been dismantled, the new suspension has been installed, and the load transfer from temporary to new suspension is about to take place, while the painting works are ongoing.</p>

Authors

Institutions

Publication Details

Published
2025-08-27
DOI
https://doi.org/10.24904/footbridge2025.37
Primary Topic
Civil and Structural Engineering Research
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Restoration of the Rochers Noirs Viaduc

Loriana Pace, Etienne Combescure, Sixte Doussau, Nina Antin
Civil and Structural Engineering Research
article

Restoration of the Rochers Noirs Viaduc

Loriana Pace, Etienne Combescure, Sixte Doussau, Nina Antin
article en

Abstract

<p>The diagnosis of the Rochers Noirs Viaduct, listed as a Heritage Building in 2000 and closed to traffic since 2006, revealed some significant defects in the suspension cables that shall be completely renewed.</p><p>Furthermore, the upper steel decking, only designed to support personnel maintaining the original railway line, is unfit for future use and shall also be fully replaced to enable the re-opening of the viaduct for soft mobilities. Some rehabilitation works also need to be undertaken on the masonry and ironworking. As of November 2023, the deck is supported by a temporary suspension, the old suspension has been dismantled, the new suspension has been installed, and the load transfer from temporary to new suspension is about to take place, while the painting works are ongoing.</p>

Heritage Preservation (US), Diversité, adaptation et développement des plantes (FR), Institution of Structural Engineers (GB)
Openalex Percentile: Top 76%
Civil and Structural Engineering Research
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.