Renovating Two Footbridges over Ripoll River in Sabadell (Spain)

<p>These two footbridges are twins and were part of the Ripoll River channelling works in Sabadell (Spain), undertaken in response to the historic floods of 1962. At the time, they represented an innovative structural solution in Spain: cantilever cable-stayed structures composed of three isostatic spans. In fact, the tensile elements had to be imported under a special permit. </p> <p>Following several inspections and technical reports, the complete restoration of the footbridges was deemed necessary. However, as the structures are listed by the City Council, their restoration required the preservation of their typology, volumetry, and materials whilst ensuring compliance with current standards and regulations. </p> <p>Both footbridges have a single span slightly exceeding 50 m in length and are 2 m wide. The deck is supported by four pairs of stay cables that pass through two pylons positioned at the abutments and are anchored to the ground. </p> <p>The rehabilitation works involved replacing the cables and the deck, restoring the pylons and abutments, and demolishing and reconstructing the anchorage blocks. </p>

Authors

Institutions

Publication Details

Published
2025-08-27
DOI
https://doi.org/10.24904/footbridge2025.40
Primary Topic
Structural Engineering and Vibration Analysis
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Renovating Two Footbridges over Ripoll River in Sabadell (Spain)

Manuel Reventós, Jaume Guàrdia
Structural Engineering and Vibration Analysis
article

Renovating Two Footbridges over Ripoll River in Sabadell (Spain)

Manuel Reventós, Jaume Guàrdia
article en

Abstract

<p>These two footbridges are twins and were part of the Ripoll River channelling works in Sabadell (Spain), undertaken in response to the historic floods of 1962. At the time, they represented an innovative structural solution in Spain: cantilever cable-stayed structures composed of three isostatic spans. In fact, the tensile elements had to be imported under a special permit. </p> <p>Following several inspections and technical reports, the complete restoration of the footbridges was deemed necessary. However, as the structures are listed by the City Council, their restoration required the preservation of their typology, volumetry, and materials whilst ensuring compliance with current standards and regulations. </p> <p>Both footbridges have a single span slightly exceeding 50 m in length and are 2 m wide. The deck is supported by four pairs of stay cables that pass through two pylons positioned at the abutments and are anchored to the ground. </p> <p>The rehabilitation works involved replacing the cables and the deck, restoring the pylons and abutments, and demolishing and reconstructing the anchorage blocks. </p>

BioVentures (United States) (US)
Openalex Percentile: Top 76%
Structural Engineering and Vibration Analysis
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Renovating Two Footbridges over Ripoll River in Sabadell (Spain) — Manuel Reventós, Jaume Guàrdia · (2025) | TGRS Research Map | TGRS