Block modeling reserves estimation

The article presents a methodology for resource estimation of a phosphate deposit based on block modeling. The advantages of applying regularization and geometric optimization algorithms for mineable units are demonstrated, ensuring more accurate differentiation of ore grades and a reduction in ore losses and dilution. A comparative analysis is conducted on the excavation of pit benches with varying slope angles and equipment configurations. It is established that a block size of 5m ×5m provides an optimal balance between model accuracy and equipment productivity. The most effective slope angle of the benches is determined based on equipment performance and cost-efficiency. The results contribute to improving the accuracy of resource forecasting and the overall economic viability of deposit development by significantly reducing operating costs and enhancing the quality of extracted material. The study outlines practical approaches to selecting appropriate equipment configurations for different mining scenarios. Special attention is paid to the influence of excavation geometry on the performance of hydraulic excavators. The methodology proposed can be applied to similar deposits with complex morphology. The research findings may serve as a basis for developing more adaptive and data-driven mine planning strategies.

Authors

Publication Details

Journal
Kompleksnoe Ispolzovanie Mineralnogo Syra = Complex Use of Mineral Resources
Published
2025-08-27
DOI
https://doi.org/10.31643/2026/6445.44
Primary Topic
Reservoir Engineering and Simulation Methods
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Block modeling reserves estimation

A. V. Golik, Р.А. Мусин, Д.Р. Ахматнуров, M.G. Yachsishin
Kompleksnoe Ispolzovanie Mineralnogo Syra = Complex Use of Mineral Resources
Reservoir Engineering and Simulation Methods
article

Block modeling reserves estimation

A. V. Golik, Р.А. Мусин, Д.Р. Ахматнуров, M.G. Yachsishin
article en

Abstract

The article presents a methodology for resource estimation of a phosphate deposit based on block modeling. The advantages of applying regularization and geometric optimization algorithms for mineable units are demonstrated, ensuring more accurate differentiation of ore grades and a reduction in ore losses and dilution. A comparative analysis is conducted on the excavation of pit benches with varying slope angles and equipment configurations. It is established that a block size of 5m ×5m provides an optimal balance between model accuracy and equipment productivity. The most effective slope angle of the benches is determined based on equipment performance and cost-efficiency. The results contribute to improving the accuracy of resource forecasting and the overall economic viability of deposit development by significantly reducing operating costs and enhancing the quality of extracted material. The study outlines practical approaches to selecting appropriate equipment configurations for different mining scenarios. Special attention is paid to the influence of excavation geometry on the performance of hydraulic excavators. The methodology proposed can be applied to similar deposits with complex morphology. The research findings may serve as a basis for developing more adaptive and data-driven mine planning strategies.

Kompleksnoe Ispolzovanie Mineralnogo Syra = Complex Use of Mineral ResourcesVol. 339(4)
Openalex Percentile: Top 72%
Reservoir Engineering and Simulation Methods
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.