BIM-Enabled Two-Phase Optimization Framework for Automated Masonry Layout Efficiency

Masonry construction remains labor-intensive, with current block placement predominantly dependent on workers’ empirical knowledge. Lack of systematic cutting plans induces substantial material waste and rework, adversely affecting sustainability. We propose a two-phase optimization framework to automate and enhance masonry block arrangement efficiency. Phase 1 decomposes masonry structures into optimizable subregions by geometric features, documenting each region’s geometry and position to generate optimization datasets. Phase 2 implements a computational module using the Social Network Search (SNS) algorithm to optimize subregion layouts, recording post-optimization block coordinates and dimensions. Finally, it materializes layout configurations and generates block quantity schedules to provide precise material demand data. An integrated prototype system was implemented in four specialized block arrangement scenarios and one building case study, validating both functionality and efficiency.

Authors

Institutions

Publication Details

Journal
Buildings
Published
2025-08-26
DOI
https://doi.org/10.3390/buildings15173051
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

BIM-Enabled Two-Phase Optimization Framework for Automated Masonry Layout Efficiency

Jane W. Z. Lu, Ruopu Yu, Zhongcun Liu, Jia Lu et al.
Buildings
BIM and Construction Integration
article

BIM-Enabled Two-Phase Optimization Framework for Automated Masonry Layout Efficiency

Jane W. Z. Lu, Ruopu Yu, Zhongcun Liu, Jia Lu, Tian Qiu
article en

Abstract

Masonry construction remains labor-intensive, with current block placement predominantly dependent on workers’ empirical knowledge. Lack of systematic cutting plans induces substantial material waste and rework, adversely affecting sustainability. We propose a two-phase optimization framework to automate and enhance masonry block arrangement efficiency. Phase 1 decomposes masonry structures into optimizable subregions by geometric features, documenting each region’s geometry and position to generate optimization datasets. Phase 2 implements a computational module using the Social Network Search (SNS) algorithm to optimize subregion layouts, recording post-optimization block coordinates and dimensions. Finally, it materializes layout configurations and generates block quantity schedules to provide precise material demand data. An integrated prototype system was implemented in four specialized block arrangement scenarios and one building case study, validating both functionality and efficiency.

BuildingsVol. 15(17)
Nanchang University (CN), Kowloon Hospital (CN)
Openalex Percentile: Top 76%
BIM and Construction Integration
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

BIM-Enabled Two-Phase Optimization Framework for Automated Masonry Layout Efficiency — Jane W. Z. Lu, Ruopu Yu, et al. · Buildings (2025) | TGRS Research Map | TGRS