Evaluating the Effectiveness of Public-Private Partnerships (PPPS) In Enhancing Construction Work: A case study of the Lusaka-Ndola Dual Carriageway Project

Public-Private Partnerships (PPPs) are increasingly being used to improve infrastructure delivery in poor nations, with the prospect of increased cost efficiency, faster timeframes, higher building quality, and risk-sharing innovations. The transformation of Zambia's Lusaka-Ndola Dual Carriageway into a PPP provided a strategic opportunity to evaluate these assertions in the context of local fiscal constraints and governance issues. The purpose of this study was to assess the success of PPPs in Zambia's road sector through mixed-methods research, which included thematic analysis of qualitative data and multiple regression modelling of survey responses from 120 participants representing the government, private sector, and road user groups. The results showed a 52% reduction in per-kilometer cost via PPP compared to traditional procurement, as well as a projected 23% reduction in delivery time and a 23% improvement in construction quality measures, including pavement compliance. However, institutional coordination received the lowest rating, with fragmentation and insufficient enforcement noted as limiting issues. The study shows that, while PPPs can result in significant efficiency and quality increases, these advantages are limited by systemic governance flaws. To fully realize the potential of PPPs in Zambia, it advises boosting transparency measures, reducing bureaucratic processes, implementing international quality standards, and improving institutional capacity through cross-agency collaboration and stakeholder engagement.

Authors

Institutions

Publication Details

Journal
East African Finance Journal
Published
2025-08-25
DOI
https://doi.org/10.59413/eafj/v4.i3.7
Citations
1
Primary Topic
Public-Private Partnership Projects
Type
article
Field-Weighted Citation Impact
2.23
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Evaluating the Effectiveness of Public-Private Partnerships (PPPS) In Enhancing Construction Work: A case study of the Lusaka-Ndola Dual Carriageway Project

Lindokuhle Phiri, Cosby Chama
1 citations
East African Finance Journal
Public-Private Partnership Projects
2.23
article

Evaluating the Effectiveness of Public-Private Partnerships (PPPS) In Enhancing Construction Work: A case study of the Lusaka-Ndola Dual Carriageway Project

Lindokuhle Phiri, Cosby Chama
article en
1 citations

Abstract

Public-Private Partnerships (PPPs) are increasingly being used to improve infrastructure delivery in poor nations, with the prospect of increased cost efficiency, faster timeframes, higher building quality, and risk-sharing innovations. The transformation of Zambia's Lusaka-Ndola Dual Carriageway into a PPP provided a strategic opportunity to evaluate these assertions in the context of local fiscal constraints and governance issues. The purpose of this study was to assess the success of PPPs in Zambia's road sector through mixed-methods research, which included thematic analysis of qualitative data and multiple regression modelling of survey responses from 120 participants representing the government, private sector, and road user groups. The results showed a 52% reduction in per-kilometer cost via PPP compared to traditional procurement, as well as a projected 23% reduction in delivery time and a 23% improvement in construction quality measures, including pavement compliance. However, institutional coordination received the lowest rating, with fragmentation and insufficient enforcement noted as limiting issues. The study shows that, while PPPs can result in significant efficiency and quality increases, these advantages are limited by systemic governance flaws. To fully realize the potential of PPPs in Zambia, it advises boosting transparency measures, reducing bureaucratic processes, implementing international quality standards, and improving institutional capacity through cross-agency collaboration and stakeholder engagement.

East African Finance JournalVol. 4(3)
Cavendish University Zambia (ZM)
Openalex Percentile: Top 9%
Public-Private Partnership Projects
2.23
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.