Numerical Simulation and Fatigue Analysis of the Grout Layer Replacement for Horizontal Joint of Wind Turbine Prestressed Concrete Tower

There are many engineering applications of prestressed concrete tower as the wind turbine support structure, and the concrete tower has the advantages of applicability and economy with good prospects. This paper proposes a grout layer replacement scheme for the problem of grout missing in the horizontal joint of concrete tower segments, and conducts a series of numerical simulation and fatigue analysis. The simulation results show that, for the case of grout missing, there is an obvious stress unevenness in the local area of severe grout missing. The concrete compressive stress decreases, tensile stress increases, tensile damage zone develops, and steel rebars stress increases, which can lead to local concrete cracking and blocks falling. For the case of grout filling and replacement completion, using no expansion grout for repair makes little contributions to the recovery of concrete stress, while using slight expansion grout can restore the concrete local stress to an even state. The fatigue analysis results show that, for the case of grout missing, the fatigue damage factors greatly exceed the limit, indicating a short fatigue life and the potential risk of local failure. For the case of grout filling and replacement completion, using no expansion grout cannot decrease fatigue damage, while using slight expansion grout can decrease fatigue damage and improve fatigue life. This paper provides the investigation into the effectiveness of grout layer replacement for horizontal joint, and the presented results can provide technical supports for the analysis and solution of grout missing problems.

Authors

Institutions

Publication Details

Journal
International Journal of Concrete Structures and Materials
Published
2025-08-25
DOI
https://doi.org/10.1186/s40069-025-00800-5
Primary Topic
Structural Load-Bearing Analysis
Type
article
Field-Weighted Citation Impact
0.00

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Numerical Simulation and Fatigue Analysis of the Grout Layer Replacement for Horizontal Joint of Wind Turbine Prestressed Concrete Tower

Minjuan He, Dongping Huang, Zheng Li, Ziwei Wang
1 links
International Journal of Concrete Structures and Materials
Structural Load-Bearing Analysis
article

Numerical Simulation and Fatigue Analysis of the Grout Layer Replacement for Horizontal Joint of Wind Turbine Prestressed Concrete Tower

Minjuan He, Dongping Huang, Zheng Li, Ziwei Wang
article en

Abstract

There are many engineering applications of prestressed concrete tower as the wind turbine support structure, and the concrete tower has the advantages of applicability and economy with good prospects. This paper proposes a grout layer replacement scheme for the problem of grout missing in the horizontal joint of concrete tower segments, and conducts a series of numerical simulation and fatigue analysis. The simulation results show that, for the case of grout missing, there is an obvious stress unevenness in the local area of severe grout missing. The concrete compressive stress decreases, tensile stress increases, tensile damage zone develops, and steel rebars stress increases, which can lead to local concrete cracking and blocks falling. For the case of grout filling and replacement completion, using no expansion grout for repair makes little contributions to the recovery of concrete stress, while using slight expansion grout can restore the concrete local stress to an even state. The fatigue analysis results show that, for the case of grout missing, the fatigue damage factors greatly exceed the limit, indicating a short fatigue life and the potential risk of local failure. For the case of grout filling and replacement completion, using no expansion grout cannot decrease fatigue damage, while using slight expansion grout can decrease fatigue damage and improve fatigue life. This paper provides the investigation into the effectiveness of grout layer replacement for horizontal joint, and the presented results can provide technical supports for the analysis and solution of grout missing problems.

International Journal of Concrete Structures and MaterialsVol. 19(1)
Tongji University (CN), Shanghai Tongji Urban Planning and Design Institute (CN)
Fundamental Research Funds for the Central Universities
Affordable and clean energy
Openalex Percentile: Top 77%
Structural Load-Bearing Analysis
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.