ARCHITECTURE OF A MULTI-AGENT INTELLIGENT CONTROL SYSTEM FOR REPAIRS OF HEATING EQUIPMENT
The article analyzes various types of repairs for process control system (PCS) equipment. A three-level intelligent system is proposed, designed to predict maintenance schedules for automated equipment. The principles of operation of an urban gas boiler house are examined, along with the structure and interaction of the proposed system's levels. As part of the study, a mimic diagram was developed for dispatcher monitoring of key boiler house equipment using MasterSCADA 4D software. A multi-agent approach was applied to solve predictive maintenance and repair tasks.
Authors
- Anatoliy Shvetcov
- M. Makarovsky
Institutions
- Vologda State University (RU)
Publication Details
- Published
- 2025-08-25
- DOI
- https://doi.org/10.58168/phbsc-it2025_237-244
- Primary Topic
- Engineering Diagnostics and Reliability
- Type
- article
- Field-Weighted Citation Impact
- 0.00