Numerical Simulation Study on the Influence of Roof-Cutting Angle on the Stability of Gob-Side Entry Retaining Without Coal Pillars
For the gob-side entry retaining of the 21311 auxiliary intake airway in Xiangshan Mine, a numerical calculation model for automatic entry formation through roof cutting and pressure relief in the fully-mechanized mining face of Xiangshan Mine was established using numerical simulation software. The model simulated the stress and displacement distribution characteristics of the surrounding rock when the roof-cutting height was 6 m and the slit angles were 0°, 5°, 10° and 15°. It also analyzed the impact of the roof-cutting angle on the pressure relief effect. The research results indicate that increasing the roof-cutting angle is conducive to pressure relief on the roadway roof, but the effect becomes less pronounced once the angle increases to a certain extent. Through numerical simulation, it was determined that when the reasonable roof-cutting height in Xiangshan Mine is 6 m, the reasonable roof-cutting angle is 10°.
Authors
- Yi Zhang (ORCID: https://orcid.org/0000-0001-7153-0955)
Publication Details
- Journal
- International Journal of Natural Resources and Environmental Studies
- Published
- 2025-08-04
- DOI
- https://doi.org/10.62051/ijnres.v6n3.09
- Primary Topic
- Geomechanics and Mining Engineering
- Type
- article
- Field-Weighted Citation Impact
- 0.00
Funders
- China Coal Technology Engineering Group