A Model to Predict the Construction Schedule of High-rise Building Projects Using Minimal Project Information

Construction involves the design and assembly of immovable, site-specific structures, often delivered through temporary teams. The construction industry faces ongoing pressure to provide cost-effective, sustainable solutions. Many construction projects experience significant delays due to prediction errors at the initial phases of the project, and case-based reasoning (CBR) could offer an effective method for estimating and predicting accurate construction schedule to reduce delays. While CBR has been used to forecasting construction delays, research on applying it to construction schedules is limited. This study focuses on developing a CBR-based methodology to predict construction schedule in residential high-rise construction, using equal weighting across various attributes (a "feature counting" approach). The predicted schedules are compared to observed data to assess model accuracy and reliability. A framework for continuously capturing and applying lessons learned can help future projects better anticipate and control project schedules. Though the overall prediction accuracy is not exceptionally high, the models demonstrate improved reliability with larger case databases. Further research is still needed to refine and address practical implementation challenges.

Publication Details

Published
2024-11-24
DOI
https://doi.org/10.71427/iccpmce2024/60
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

A Model to Predict the Construction Schedule of High-rise Building Projects Using Minimal Project Information

BIM and Construction Integration
article

A Model to Predict the Construction Schedule of High-rise Building Projects Using Minimal Project Information

article en

Abstract

Construction involves the design and assembly of immovable, site-specific structures, often delivered through temporary teams. The construction industry faces ongoing pressure to provide cost-effective, sustainable solutions. Many construction projects experience significant delays due to prediction errors at the initial phases of the project, and case-based reasoning (CBR) could offer an effective method for estimating and predicting accurate construction schedule to reduce delays. While CBR has been used to forecasting construction delays, research on applying it to construction schedules is limited. This study focuses on developing a CBR-based methodology to predict construction schedule in residential high-rise construction, using equal weighting across various attributes (a "feature counting" approach). The predicted schedules are compared to observed data to assess model accuracy and reliability. A framework for continuously capturing and applying lessons learned can help future projects better anticipate and control project schedules. Though the overall prediction accuracy is not exceptionally high, the models demonstrate improved reliability with larger case databases. Further research is still needed to refine and address practical implementation challenges.

Openalex Percentile: Top 68%
BIM and Construction Integration
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

A Model to Predict the Construction Schedule of High-rise Building Projects Using Minimal Project Information · (2024) | TGRS Research Map | TGRS