Integrated Life-Cycle Cost-Benefit Evaluation Incorporating BIM, Lean Practices, and Sustainability in Engineering Project Management

Engineering project management has entered a transformative phase where digitalization, process optimization, and sustainability imperatives converge to redefine cost and value delivery.Traditional project evaluation methods, often focused on initial capital costs, fail to capture the broader economic, operational, and environmental implications over an asset's entire life cycle.This gap underscores the need for an integrated life-cycle cost-benefit evaluation framework that holistically incorporates Building Information Modeling (BIM), Lean construction practices, and sustainability principles.At the broader level, BIM enables advanced visualization, data-driven decision-making, and predictive modeling across design, construction, and operations, ensuring stakeholders anticipate risks and optimize resource allocation.Lean practices, on the other hand, minimize waste, streamline workflows, and enhance productivity, leading to measurable reductions in cost overruns and project delays.When sustainability is embedded as a core dimension, the framework extends beyond financial considerations to encompass environmental performance, energy efficiency, and social responsibility, aligning engineering projects with global carbon reduction and resilience goals.This integration creates a synergistic evaluation model where life-cycle costs are assessed against tangible and intangible benefits, enabling project managers to justify investments not only on economic efficiency but also on long-term stakeholder value.Furthermore, the proposed approach strengthens project governance by providing transparent metrics that support client satisfaction, regulatory compliance, and sustainable competitive advantage.By narrowing the scope to engineering project management, the study demonstrates how integrating BIM, Lean, and sustainability into a unified cost-benefit evaluation methodology bridges the divide between short-term efficiency and longterm value creation.This holistic perspective positions project managers to make informed, future-ready decisions in increasingly complex engineering environments.

Publication Details

Journal
International Journal of Computer Applications Technology and Research
Published
2025-08-17
DOI
https://doi.org/10.7753/ijcatr0712.1011
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Integrated Life-Cycle Cost-Benefit Evaluation Incorporating BIM, Lean Practices, and Sustainability in Engineering Project Management

International Journal of Computer Applications Technology and Research
Construction Project Management and Performance
article

Integrated Life-Cycle Cost-Benefit Evaluation Incorporating BIM, Lean Practices, and Sustainability in Engineering Project Management

article en

Abstract

Engineering project management has entered a transformative phase where digitalization, process optimization, and sustainability imperatives converge to redefine cost and value delivery.Traditional project evaluation methods, often focused on initial capital costs, fail to capture the broader economic, operational, and environmental implications over an asset's entire life cycle.This gap underscores the need for an integrated life-cycle cost-benefit evaluation framework that holistically incorporates Building Information Modeling (BIM), Lean construction practices, and sustainability principles.At the broader level, BIM enables advanced visualization, data-driven decision-making, and predictive modeling across design, construction, and operations, ensuring stakeholders anticipate risks and optimize resource allocation.Lean practices, on the other hand, minimize waste, streamline workflows, and enhance productivity, leading to measurable reductions in cost overruns and project delays.When sustainability is embedded as a core dimension, the framework extends beyond financial considerations to encompass environmental performance, energy efficiency, and social responsibility, aligning engineering projects with global carbon reduction and resilience goals.This integration creates a synergistic evaluation model where life-cycle costs are assessed against tangible and intangible benefits, enabling project managers to justify investments not only on economic efficiency but also on long-term stakeholder value.Furthermore, the proposed approach strengthens project governance by providing transparent metrics that support client satisfaction, regulatory compliance, and sustainable competitive advantage.By narrowing the scope to engineering project management, the study demonstrates how integrating BIM, Lean, and sustainability into a unified cost-benefit evaluation methodology bridges the divide between short-term efficiency and longterm value creation.This holistic perspective positions project managers to make informed, future-ready decisions in increasingly complex engineering environments.

International Journal of Computer Applications Technology and Research
Responsible consumption and production
Openalex Percentile: Top 74%
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Integrated Life-Cycle Cost-Benefit Evaluation Incorporating BIM, Lean Practices, and Sustainability in Engineering Project Management · International Journal of Computer Applications Technology and Research (2025) | TGRS Research Map | TGRS