Multi-objective optimization of smart grid operations via preventive maintenance scheduling using time-dependent unavailability

This paper presents a method for multi-criteria optimization of system operations using transient operation models. Real systems often combine long-living components with rapid repairs, creating challenges for numerical integration due to fine discretization requirements. These challenges significantly increase the computational cost when evaluating renewal processes with recurrent terms of quadratic complexity in mission time. To address this, we derive new mathematical formulas for evaluating unavailability and operational costs of components under periodic, age-based preventive restoration. The key innovation is a decomposition of the renewal equation: repair-related terms are approximated analytically, eliminating the need for fine discretization throughout the process. A special formula is introduced for components with uniformly distributed repair times and mean time to repair much shorter than mean time to failure, applicable to many real-world systems. The accuracy of the proposed approach is validated against Monte Carlo simulations, showing significant reduction in computational effort. This efficiency enables repeated evaluations in optimization tasks, demonstrated on a real-world case involving interconnected energy and communication infrastructure in the Czech Republic. A multi-objective NSGA-II algorithm is employed to optimize the preventive replacement policy, minimizing both system maintenance cost and expected downtime. We also explore systems with components of non-zero initial age. Results show that relying solely on asymptotic approximations may lead to suboptimal strategies, potentially worsening performance. However, allowing preventive renewal of selected components at time zero enables identification of superior solutions.

Authors

Publication Details

Journal
Reliability Engineering & System Safety
Published
2025-08-15
DOI
https://doi.org/10.1016/j.ress.2025.111567
Primary Topic
Power System Reliability and Maintenance
Type
article
Field-Weighted Citation Impact
0.00

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Multi-objective optimization of smart grid operations via preventive maintenance scheduling using time-dependent unavailability

Petr Toman, Radim Briš, Radek Fujdiak, Matěj Vrtal et al.
Reliability Engineering & System Safety
Power System Reliability and Maintenance
article

Multi-objective optimization of smart grid operations via preventive maintenance scheduling using time-dependent unavailability

Petr Toman, Radim Briš, Radek Fujdiak, Matěj Vrtal, Pavel Praks, Daniel Krpelík
article en

Abstract

This paper presents a method for multi-criteria optimization of system operations using transient operation models. Real systems often combine long-living components with rapid repairs, creating challenges for numerical integration due to fine discretization requirements. These challenges significantly increase the computational cost when evaluating renewal processes with recurrent terms of quadratic complexity in mission time. To address this, we derive new mathematical formulas for evaluating unavailability and operational costs of components under periodic, age-based preventive restoration. The key innovation is a decomposition of the renewal equation: repair-related terms are approximated analytically, eliminating the need for fine discretization throughout the process. A special formula is introduced for components with uniformly distributed repair times and mean time to repair much shorter than mean time to failure, applicable to many real-world systems. The accuracy of the proposed approach is validated against Monte Carlo simulations, showing significant reduction in computational effort. This efficiency enables repeated evaluations in optimization tasks, demonstrated on a real-world case involving interconnected energy and communication infrastructure in the Czech Republic. A multi-objective NSGA-II algorithm is employed to optimize the preventive replacement policy, minimizing both system maintenance cost and expected downtime. We also explore systems with components of non-zero initial age. Results show that relying solely on asymptotic approximations may lead to suboptimal strategies, potentially worsening performance. However, allowing preventive renewal of selected components at time zero enables identification of superior solutions.

Reliability Engineering & System SafetyVol. 265
Ministerstvo Vnitra České Republiky, European Commission, Ministerstvo Školství, Mládeže a Tělovýchovy
Openalex Percentile: Top 74%
Power System Reliability and Maintenance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.