Seismic risk quantification for multi-unit probabilistic safety assessment based on the partial binary decision diagram approach
• Two approaches are proposed for risk quantification of seismic multi-unit PSA. • The approaches can generate minimal cut sets (MCSs) as well as near-exact risk. • Fault tree approach has limitations for PSA models with a large number of units. • MCS post-processing approach is applicable to PSA models with a large number of units. • The obtained near-exact risks are compared with those from the Monte Carlo approach. Many efforts have been made to quantitatively evaluate seismic risk in multi-unit probabilistic safety assessment (PSA) models in light of the fact that the success units cannot be neglected due to the seismic events with large failure probabilities. Previously, a partial binary decision diagram (BDD) approach was shown to generate minimal cut sets (MCSs) with near-exact single-unit risk. To extend this approach to multi-unit risk, this study explores two approaches: one based on fault tree modeling, and one based on the post-processing of MCSs. The first approach reflects the fault trees of success units by converting into BDD logic for risk-significant cut sets of single-unit risk. A multi-unit PSA model with two units was evaluated, and the results showed near-exact risk. However, this approach can produce inaccurate risk based on the cut-off value and MCS information that is difficult to understand for a multi-unit PSA model with many units. The proposed post-processing approach regards the MCSs of success units as different super events according to what shared events are included in each cut set. To implement this approach, a software tool was developed, with the results of a multi-unit site having six units showing near-exact risk along with the MCSs.
Authors
- Sang Hoon Han (ORCID: https://orcid.org/0000-0002-5961-6526)
- Jae Young Yoon
Institutions
- Korea Atomic Energy Research Institute (KR)
Publication Details
- Journal
- Reliability Engineering & System Safety
- Published
- 2025-08-15
- DOI
- https://doi.org/10.1016/j.ress.2025.111581
- Primary Topic
- Risk and Safety Analysis
- Type
- article
- Field-Weighted Citation Impact
- 0.00
Funders
- Ministry of Trade, Industry and Energy
- Korea Institute of Energy Technology Evaluation and Planning