Experimental study of treatment in a sedimentation tank to minimise the suspended solids

It is common practice for cooling water systems in power plants to include a sludge tank to collect sludge and slurry. This research focuses on the development of a model that can be used as an aid in the design, operation, and modification of a settling tank, and the simulation of a sludge tank design in flow-through mode as a settling tank for suspended solids from cooling water systems. The purpose of this study is to investigate and understand the use of a sedimentation tank for cooling water system treatment to minimize SS through simulation. The research methodology was to determine, under laboratory conditions, the particle settling capacity and clarification performance in a settling tank: settling time, sedimentation rate, settleability, and productivity for a settling tank. The granulometric composition of the suspended solids was investigated to determine the circularity factor, the sphericity of the different types of particles, and the solidity of the suspended solids. Thus, the introduction of water treatment with a sedimentation tank with the geometric parameters used in this study will make it possible to remove up to 560m 3 of suspended solids per quarter from the cooling water system.

Authors

Publication Details

Journal
Key engineering materials
Published
2025-08-22
DOI
https://doi.org/10.4028/p-8ca1sy
Citations
1
Primary Topic
Cyclone Separators and Fluid Dynamics
Type
article
Field-Weighted Citation Impact
1.33
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Experimental study of treatment in a sedimentation tank to minimise the suspended solids

Olha Biedunkova, Павло Кузнєцов
1 citations
Key engineering materials
Cyclone Separators and Fluid Dynamics
1.33
article

Experimental study of treatment in a sedimentation tank to minimise the suspended solids

Olha Biedunkova, Павло Кузнєцов
article en
1 citations

Abstract

It is common practice for cooling water systems in power plants to include a sludge tank to collect sludge and slurry. This research focuses on the development of a model that can be used as an aid in the design, operation, and modification of a settling tank, and the simulation of a sludge tank design in flow-through mode as a settling tank for suspended solids from cooling water systems. The purpose of this study is to investigate and understand the use of a sedimentation tank for cooling water system treatment to minimize SS through simulation. The research methodology was to determine, under laboratory conditions, the particle settling capacity and clarification performance in a settling tank: settling time, sedimentation rate, settleability, and productivity for a settling tank. The granulometric composition of the suspended solids was investigated to determine the circularity factor, the sphericity of the different types of particles, and the solidity of the suspended solids. Thus, the introduction of water treatment with a sedimentation tank with the geometric parameters used in this study will make it possible to remove up to 560m 3 of suspended solids per quarter from the cooling water system.

Key engineering materialsVol. 1020
Openalex Percentile: Top 19%
Cyclone Separators and Fluid Dynamics
1.33
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Experimental study of treatment in a sedimentation tank to minimise the suspended solids — Olha Biedunkova, Павло Кузнєцов · Key engineering materials (2025) | TGRS Research Map | TGRS