Cost Modelling for Public Housing in The State of Kuwait

The construction of public residential projects in Kuwait started in the 1950s by the Public Authority of Housing welfare. Today, an approximate waiting period of 20 years is needed to obtain a house ready to live in. The major problem is that most of the owners of these public housing units are unsatisfied with the overall design and finishing. These public houses have one design and structure that does not fulfill the end users’ needs and aspirations. This leads to a long revamping process carried out by the units’ owners that provides end-users with all means of comfort and satisfactions. The repercussions that stem from this is a delay in moving time and the cost expenses that the end users have to suffer as the people in need of these homes have limited financial incomes and cannot afford these expenses. A survey assessing public housing design and cost are implemented for projects constructed by Housing Welfare. Additionally, personal interviews and questionnaires surveys for both public and private residential projects end users formed the data base for the study. The estimate of revamping expenses is determined along with identifying the reasons behind the changes. This paper presents the findings of a research project aiming to determine the cost comparison between private and public residential projects. The research shows that concrete costs are consistent across both types of housing, with the overall cost being primarily influenced by the quality of the finishing. Additionally, the paper investigates owner satisfaction with public housing to identify potential improvements in policies, plans, and procedures for future public residential projects. It is recommended that homeowners be given the option to either complete their own finishing or receive a house with finishing already done.

Authors

Publication Details

Published
2024-11-24
DOI
https://doi.org/10.71427/iccpmce2024/10
Primary Topic
Housing Market and Economics
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Cost Modelling for Public Housing in The State of Kuwait

Alia H Esmael
Housing Market and Economics
article

Cost Modelling for Public Housing in The State of Kuwait

Alia H Esmael
article en

Abstract

The construction of public residential projects in Kuwait started in the 1950s by the Public Authority of Housing welfare. Today, an approximate waiting period of 20 years is needed to obtain a house ready to live in. The major problem is that most of the owners of these public housing units are unsatisfied with the overall design and finishing. These public houses have one design and structure that does not fulfill the end users’ needs and aspirations. This leads to a long revamping process carried out by the units’ owners that provides end-users with all means of comfort and satisfactions. The repercussions that stem from this is a delay in moving time and the cost expenses that the end users have to suffer as the people in need of these homes have limited financial incomes and cannot afford these expenses. A survey assessing public housing design and cost are implemented for projects constructed by Housing Welfare. Additionally, personal interviews and questionnaires surveys for both public and private residential projects end users formed the data base for the study. The estimate of revamping expenses is determined along with identifying the reasons behind the changes. This paper presents the findings of a research project aiming to determine the cost comparison between private and public residential projects. The research shows that concrete costs are consistent across both types of housing, with the overall cost being primarily influenced by the quality of the finishing. Additionally, the paper investigates owner satisfaction with public housing to identify potential improvements in policies, plans, and procedures for future public residential projects. It is recommended that homeowners be given the option to either complete their own finishing or receive a house with finishing already done.

Openalex Percentile: Top 65%
Housing Market and Economics
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.