Manajemen Biaya dan Waktu Pelaksanaan Proyek Pembangunan Co-Working Space Kabupaten Lamongan

In construction projects, particularly in the development of the Co-Working Space in Lamongan Regency, discrepancies between the planned schedule and actual outcomes often occur, both in terms of time and cost. This is generally caused by ineffective planning and control during project execution. This study aims to analyze cost and time management of the project to achieve more efficient and timely implementation. The research method applies the Critical Path Method (CPM) as the primary approach to determine the critical path and minimum project duration, complemented by the Program Evaluation and Review Technique (PERT) to estimate time uncertainties. The results show that using CPM, the critical path involves activities A, B, D, F, G, E, V, X, AA, AB, AD, AE, AG, AK, AT, BA, AU, AV, AY, BB, BD, AZ, BH, and BE with a total duration of 136 days, saving 22 days from the initial plan of 158 days. Using PERT with the same critical path, the project is estimated to be completed in 148 days, saving 10 days, with a cumulative distribution value of 3.7, indicating a 99.98% probability of project completion before the target date. In conclusion, CPM and PERT are effective for controlling project cost and time, with CPM providing greater time efficiency.

Authors

Publication Details

Journal
Jurnal Talenta Sipil
Published
2025-08-04
DOI
https://doi.org/10.33087/talentasipil.v8i2.951
Primary Topic
Occupational Health and Safety Management
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Manajemen Biaya dan Waktu Pelaksanaan Proyek Pembangunan Co-Working Space Kabupaten Lamongan

Rasio Hepiyanto, Rio Rahma Dhana, Andreyas Dian Febrianto
Jurnal Talenta Sipil
Occupational Health and Safety Management
article

Manajemen Biaya dan Waktu Pelaksanaan Proyek Pembangunan Co-Working Space Kabupaten Lamongan

Rasio Hepiyanto, Rio Rahma Dhana, Andreyas Dian Febrianto
article en

Abstract

In construction projects, particularly in the development of the Co-Working Space in Lamongan Regency, discrepancies between the planned schedule and actual outcomes often occur, both in terms of time and cost. This is generally caused by ineffective planning and control during project execution. This study aims to analyze cost and time management of the project to achieve more efficient and timely implementation. The research method applies the Critical Path Method (CPM) as the primary approach to determine the critical path and minimum project duration, complemented by the Program Evaluation and Review Technique (PERT) to estimate time uncertainties. The results show that using CPM, the critical path involves activities A, B, D, F, G, E, V, X, AA, AB, AD, AE, AG, AK, AT, BA, AU, AV, AY, BB, BD, AZ, BH, and BE with a total duration of 136 days, saving 22 days from the initial plan of 158 days. Using PERT with the same critical path, the project is estimated to be completed in 148 days, saving 10 days, with a cumulative distribution value of 3.7, indicating a 99.98% probability of project completion before the target date. In conclusion, CPM and PERT are effective for controlling project cost and time, with CPM providing greater time efficiency.

Jurnal Talenta SipilVol. 8(2)
Openalex Percentile: Top 68%
Occupational Health and Safety Management
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Manajemen Biaya dan Waktu Pelaksanaan Proyek Pembangunan Co-Working Space Kabupaten Lamongan — Rasio Hepiyanto, Rio Rahma Dhana, et al. · Jurnal Talenta Sipil (2025) | TGRS Research Map | TGRS