Research on Schedule Optimization of Information System Project Based on Genetic Algorithm

With the increasing complexity of information system projects, efficient schedule management is very important. This study focuses on the genetic algorithm based information system project schedule optimization, points out the key significance of information system project schedule management for successful project delivery and cost control, and analyzes the limitations of traditional methods in the face of complex projects, which are difficult to find the global optimal solution. This paper constructs an optimization model with resource constraints and activity logic, designs adaptive genetic algorithm, uses literature and case analysis method, takes an enterprise ERP system project as an example, collects data and solves it by genetic algorithm. The results show that the algorithm can effectively shorten the project duration, optimize resource allocation, and improve the efficiency of project schedule management. At the same time, it summarizes the shortcomings, points out the direction for subsequent multi-objective optimization and other research, and helps the development of information system project management practice and theory.

Authors

Institutions

Publication Details

Published
2025-02-28
DOI
https://doi.org/10.1109/isbdas64762.2025.11116864
Primary Topic
Resource-Constrained Project Scheduling
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Research on Schedule Optimization of Information System Project Based on Genetic Algorithm

Yi Zhou, Lei Zhao
Resource-Constrained Project Scheduling
article

Research on Schedule Optimization of Information System Project Based on Genetic Algorithm

Yi Zhou, Lei Zhao
article en

Abstract

With the increasing complexity of information system projects, efficient schedule management is very important. This study focuses on the genetic algorithm based information system project schedule optimization, points out the key significance of information system project schedule management for successful project delivery and cost control, and analyzes the limitations of traditional methods in the face of complex projects, which are difficult to find the global optimal solution. This paper constructs an optimization model with resource constraints and activity logic, designs adaptive genetic algorithm, uses literature and case analysis method, takes an enterprise ERP system project as an example, collects data and solves it by genetic algorithm. The results show that the algorithm can effectively shorten the project duration, optimize resource allocation, and improve the efficiency of project schedule management. At the same time, it summarizes the shortcomings, points out the direction for subsequent multi-objective optimization and other research, and helps the development of information system project management practice and theory.

Chengdu University of Information Technology (CN), Chengdu University of Technology (CN)
Openalex Percentile: Top 74%
Resource-Constrained Project Scheduling
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Research on Schedule Optimization of Information System Project Based on Genetic Algorithm — Yi Zhou, Lei Zhao · (2025) | TGRS Research Map | TGRS