Reduction of Total Installation Time for Floating Offshore Wind Farms by Improving Actual Unit-Installation Time and Optimizing Operation Windows

Abstract An installation time estimation model for floating offshore wind farms (FOWFs) has been studied and validated based on the cost breakdown structure, and the unit-installation time has been estimated using data from FOWF projects. However, since the unit-installation time includes weather downtime, applying it to other areas with different weather conditions is challenging. In this paper, we propose an installation time estimation model for FOWFs that incorporates weather characteristics specific to the project site, extending upon our previous model. Using installation data from the Fukushima floating offshore wind farm demonstration project in Japan, we estimated actual unit-installation time excluding weather downtime and compared it with that of Hywind Scotland. The results showed that for the pre-anchoring process, the total of the pre-installation time per mooring line and the tensile testing time per anchor in Japan is about 4.1 times longer than those in Europe. As for submarine cables, the time for connecting one side of a riser cable to a floater is 9.3 times longer and the velocity of the trenching cables is 7.5 times slower. Assuming a theoretical FOWF, the total installation time in Japan, Korea, and Taiwan varies from 899 days to 1,214 days. After performing a sensitivity analysis, we found that the total installation time can be reduced by 61% if we adjust the actual unit-installation time and the weather restrictions from the present conditions in Japan to those in Europe. These findings indicate that our model can provide a more general framework for estimating the installation time of FOWF.

Authors

Institutions

Publication Details

Published
2025-06-22
DOI
https://doi.org/10.1115/omae2025-155231
Citations
1
Primary Topic
Marine and Offshore Engineering Studies
Type
article
Field-Weighted Citation Impact
1.15
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Reduction of Total Installation Time for Floating Offshore Wind Farms by Improving Actual Unit-Installation Time and Optimizing Operation Windows

Ken Haneda, Tomohiro Hasumi, Toshifumi Fujiwara, Takeshi Yokoi et al.
1 citations
Marine and Offshore Engineering Studies
1.15
article

Reduction of Total Installation Time for Floating Offshore Wind Farms by Improving Actual Unit-Installation Time and Optimizing Operation Windows

Ken Haneda, Tomohiro Hasumi, Toshifumi Fujiwara, Takeshi Yokoi, Toshiki Chujo
article en
1 citations

Abstract

Abstract An installation time estimation model for floating offshore wind farms (FOWFs) has been studied and validated based on the cost breakdown structure, and the unit-installation time has been estimated using data from FOWF projects. However, since the unit-installation time includes weather downtime, applying it to other areas with different weather conditions is challenging. In this paper, we propose an installation time estimation model for FOWFs that incorporates weather characteristics specific to the project site, extending upon our previous model. Using installation data from the Fukushima floating offshore wind farm demonstration project in Japan, we estimated actual unit-installation time excluding weather downtime and compared it with that of Hywind Scotland. The results showed that for the pre-anchoring process, the total of the pre-installation time per mooring line and the tensile testing time per anchor in Japan is about 4.1 times longer than those in Europe. As for submarine cables, the time for connecting one side of a riser cable to a floater is 9.3 times longer and the velocity of the trenching cables is 7.5 times slower. Assuming a theoretical FOWF, the total installation time in Japan, Korea, and Taiwan varies from 899 days to 1,214 days. After performing a sensitivity analysis, we found that the total installation time can be reduced by 61% if we adjust the actual unit-installation time and the weather restrictions from the present conditions in Japan to those in Europe. These findings indicate that our model can provide a more general framework for estimating the installation time of FOWF.

National Maritime Research Institute (JP)
Openalex Percentile: Top 20%
Marine and Offshore Engineering Studies
1.15
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.