Analisis Produktivitas Tenaga Kerja dengan Metode Time Study pada Proyek Pedestrian Depan Stadion Surajaya Lamongan

Human resources are very important in the work environment, especially in the construction sector. Without a qualified and productive workforce, the project results will not be satisfactory. This research aims to observe the productivity of workers while constructing the pedestrian in front of the Surajaya Stadium in Lamongan, focusing on rebar work, formwork installation, and concreting using the time study method. The initial stage involves analyzing the project and collecting data that will be used as material for observing labor productivity. The productivity for foundation rebar work is recorded at 134.86 kg/person/day, and for column rebar work at 96.84 kg/person/day. The productivity value for formwork also varies, reaching 351.82 m²/person/day for slab formwork work.. Casting work has varying productivity, for example 9.10 m3/person/day for foundation casting. Several factors that affect productivity are the lack of worker skills, hot weather, and obstacles at the project site. The productivity of rebar work, formwork installation, and casting in this project is low due to the lack of worker skills, hot weather causing fatigue, and access barriers. To improve efficiency, training for workers, scheduling work hours, and managing the surrounding environment are necessary.

Authors

Publication Details

Journal
Jurnal Talenta Sipil
Published
2025-08-03
DOI
https://doi.org/10.33087/talentasipil.v8i2.961
Primary Topic
Management and Optimization Techniques
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Analisis Produktivitas Tenaga Kerja dengan Metode Time Study pada Proyek Pedestrian Depan Stadion Surajaya Lamongan

Mirza Agung Darmawan, Hammam Rofiqi Agustapraja, Samsul Arif
Jurnal Talenta Sipil
Management and Optimization Techniques
article

Analisis Produktivitas Tenaga Kerja dengan Metode Time Study pada Proyek Pedestrian Depan Stadion Surajaya Lamongan

Mirza Agung Darmawan, Hammam Rofiqi Agustapraja, Samsul Arif
article en

Abstract

Human resources are very important in the work environment, especially in the construction sector. Without a qualified and productive workforce, the project results will not be satisfactory. This research aims to observe the productivity of workers while constructing the pedestrian in front of the Surajaya Stadium in Lamongan, focusing on rebar work, formwork installation, and concreting using the time study method. The initial stage involves analyzing the project and collecting data that will be used as material for observing labor productivity. The productivity for foundation rebar work is recorded at 134.86 kg/person/day, and for column rebar work at 96.84 kg/person/day. The productivity value for formwork also varies, reaching 351.82 m²/person/day for slab formwork work.. Casting work has varying productivity, for example 9.10 m3/person/day for foundation casting. Several factors that affect productivity are the lack of worker skills, hot weather, and obstacles at the project site. The productivity of rebar work, formwork installation, and casting in this project is low due to the lack of worker skills, hot weather causing fatigue, and access barriers. To improve efficiency, training for workers, scheduling work hours, and managing the surrounding environment are necessary.

Jurnal Talenta SipilVol. 8(2)
Openalex Percentile: Top 68%
Management and Optimization Techniques
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Analisis Produktivitas Tenaga Kerja dengan Metode Time Study pada Proyek Pedestrian Depan Stadion Surajaya Lamongan — Mirza Agung Darmawan, Hammam Rofiqi Agustapraja, et al. · Jurnal Talenta Sipil (2025) | TGRS Research Map | TGRS