RESOURCE-CONSTRAINED ASSEMBLY LINE BALANCING PROBLEM AND AN APPLICATION IN AN ASSEMBLY LINE

One of the most important ways to increase productivity in industrial manufacturing is the efficient design of assembly lines. These lines consist of workstations connected by moving belts or conveyors where products are assembled part by part to reach their final form. In today's competitive manufacturing environment, organizing the work to be performed at these stations in the most efficient way is critically important. This organization process is called the “Assembly Line Balancing Problem (ALBP)” and primarily focuses on two main objectives: minimizing the number of workstations and cycle time. However, recently, this classical approach has given way to a more comprehensive perspective. Now, the optimization of resources such as workers, machines, equipment, and energy is also included in the problem. This advanced problem is termed the “Resource-Constrained ALBP (RCALBP)”. Within the scope of this study, the “Multi-Model RCALBP (MRCALBP)” was implemented in a company manufacturing industrial kitchen machines. Based on a known mathematical model in the RCALBP literature, a solution has been developed adapted to the specific needs of the company. Successful results were achieved through optimization work using 19 different resources for four different products. Two separate production lines were merged into one line, total number of resources was reduced from 46 to 31, and the number of workers was decreased from 4 to 2. At least 49% improvement in total costs has been achieved for each product. This study demonstrates that theoretical models can be successfully applied in real life and provide tangible benefits.

Authors

Institutions

Publication Details

Journal
Eskişehir Osmangazi Üniversitesi mühendislik ve mimarlık fakültesi dergisi :/Osmangazi Üniversitesi Mühendislik-Mimarlık Fakültesi dergisi
Published
2025-08-15
DOI
https://doi.org/10.31796/ogummf.1607331
Primary Topic
Assembly Line Balancing Optimization
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

RESOURCE-CONSTRAINED ASSEMBLY LINE BALANCING PROBLEM AND AN APPLICATION IN AN ASSEMBLY LINE

Seda Hezer, Mehmet Ceylan
Eskişehir Osmangazi Üniversitesi mühendislik ve mimarlık fakültesi dergisi :/Osmangazi Üniversitesi Mühendislik-Mimarlık Fakültesi dergisi
Assembly Line Balancing Optimization
article

RESOURCE-CONSTRAINED ASSEMBLY LINE BALANCING PROBLEM AND AN APPLICATION IN AN ASSEMBLY LINE

Seda Hezer, Mehmet Ceylan
article en

Abstract

One of the most important ways to increase productivity in industrial manufacturing is the efficient design of assembly lines. These lines consist of workstations connected by moving belts or conveyors where products are assembled part by part to reach their final form. In today's competitive manufacturing environment, organizing the work to be performed at these stations in the most efficient way is critically important. This organization process is called the “Assembly Line Balancing Problem (ALBP)” and primarily focuses on two main objectives: minimizing the number of workstations and cycle time. However, recently, this classical approach has given way to a more comprehensive perspective. Now, the optimization of resources such as workers, machines, equipment, and energy is also included in the problem. This advanced problem is termed the “Resource-Constrained ALBP (RCALBP)”. Within the scope of this study, the “Multi-Model RCALBP (MRCALBP)” was implemented in a company manufacturing industrial kitchen machines. Based on a known mathematical model in the RCALBP literature, a solution has been developed adapted to the specific needs of the company. Successful results were achieved through optimization work using 19 different resources for four different products. Two separate production lines were merged into one line, total number of resources was reduced from 46 to 31, and the number of workers was decreased from 4 to 2. At least 49% improvement in total costs has been achieved for each product. This study demonstrates that theoretical models can be successfully applied in real life and provide tangible benefits.

Eskişehir Osmangazi Üniversitesi mühendislik ve mimarlık fakültesi dergisi :/Osmangazi Üniversitesi Mühendislik-Mimarlık Fakültesi dergisiVol. 33(2)
Konya Technical University (TR)
Openalex Percentile: Top 70%
Assembly Line Balancing Optimization
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

RESOURCE-CONSTRAINED ASSEMBLY LINE BALANCING PROBLEM AND AN APPLICATION IN AN ASSEMBLY LINE — Seda Hezer, Mehmet Ceylan · Eskişehir Osmangazi Üniversitesi mühendislik ve mimarlık fakültesi dergisi :/Osmangazi Üniversitesi Mühendislik-Mimarlık Fakültesi dergisi (2025) | TGRS Research Map | TGRS