A MACHINE SPEED OPTIMIZATION PROBLEM IN A CAPACITATED FELT PRODUCTION SYSTEM

In this study, we analyze a felt production system with unique requirements, such as maintaining machine speeds within specific limits to facilitate successful chemical reactions. By incorporating machine speed constraints and restrictions on both work-in-process (WIP) and end-product inventories, we aim to determine the optimal production quantities for each felt type and the corresponding machine speeds over a defined planning horizon. The objective is to minimize total costs, including machine setup and production costs as well as WIP and end-product inventory holding costs. To achieve this, we introduce the Machine Speed Optimization (MSO) problem and adapt it to the specific requirements of a felt manufacturing company operating in Istanbul, Türkiye. The MSO problem is formulated as a mixed-integer linear programming (MILP) model, which is NP-hard to solve for optimal production decisions. We validate the MSO model using the felt manufacturing company's case over five periods, demonstrating its effectiveness in automating production planning and machine speed decisions. The simulations for a 5-day planning horizon demonstrate a cost reduction of 3853 TL, a 24% decrease in WIP inventory, and up to a 15% improvement in machine utilization compared to the current practices of the felt manufacturing company. Additionally, the optimized machine speeds achieved through the MSO model enable the system to increase throughput by 11%. Experimental analysis of computational complexity reveals that the MSO model can generate an optimal 6-month production plan, including machine speeds, in under one hour.

Authors

Institutions

Publication Details

Journal
Eskişehir Osmangazi Üniversitesi mühendislik ve mimarlık fakültesi dergisi :/Osmangazi Üniversitesi Mühendislik-Mimarlık Fakültesi dergisi
Published
2025-08-15
DOI
https://doi.org/10.31796/ogummf.1475020
Primary Topic
Scheduling and Optimization Algorithms
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

A MACHINE SPEED OPTIMIZATION PROBLEM IN A CAPACITATED FELT PRODUCTION SYSTEM

Banu Kabakulak
Eskişehir Osmangazi Üniversitesi mühendislik ve mimarlık fakültesi dergisi :/Osmangazi Üniversitesi Mühendislik-Mimarlık Fakültesi dergisi
Scheduling and Optimization Algorithms
article

A MACHINE SPEED OPTIMIZATION PROBLEM IN A CAPACITATED FELT PRODUCTION SYSTEM

Banu Kabakulak
article en

Abstract

In this study, we analyze a felt production system with unique requirements, such as maintaining machine speeds within specific limits to facilitate successful chemical reactions. By incorporating machine speed constraints and restrictions on both work-in-process (WIP) and end-product inventories, we aim to determine the optimal production quantities for each felt type and the corresponding machine speeds over a defined planning horizon. The objective is to minimize total costs, including machine setup and production costs as well as WIP and end-product inventory holding costs. To achieve this, we introduce the Machine Speed Optimization (MSO) problem and adapt it to the specific requirements of a felt manufacturing company operating in Istanbul, Türkiye. The MSO problem is formulated as a mixed-integer linear programming (MILP) model, which is NP-hard to solve for optimal production decisions. We validate the MSO model using the felt manufacturing company's case over five periods, demonstrating its effectiveness in automating production planning and machine speed decisions. The simulations for a 5-day planning horizon demonstrate a cost reduction of 3853 TL, a 24% decrease in WIP inventory, and up to a 15% improvement in machine utilization compared to the current practices of the felt manufacturing company. Additionally, the optimized machine speeds achieved through the MSO model enable the system to increase throughput by 11%. Experimental analysis of computational complexity reveals that the MSO model can generate an optimal 6-month production plan, including machine speeds, in under one hour.

Eskişehir Osmangazi Üniversitesi mühendislik ve mimarlık fakültesi dergisi :/Osmangazi Üniversitesi Mühendislik-Mimarlık Fakültesi dergisiVol. 33(2)
Istanbul Bilgi University (TR)
Industry, innovation and infrastructure
Openalex Percentile: Top 70%
Scheduling and Optimization Algorithms
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.