Implementasi Project Quality Management dan Perancangan Proses Bisnis Pada Milestone First Years Inspection dan di Proyek Konstruksi di PT PLN Nusantara Power

This study aims to evaluate the implementation of Project Quality Management (PQM) in the First Year Inspection (FYI) milestone of the Muara Tawar Add-On Combined Cycle Power Plant (PLTGU) Block 2 project, and to design an integrated business process using the lean construction approach. A mixed-methods research design was applied, combining observation, in-depth interviews, and document analysis. The findings reveal that the PQM implementation, based on PMBOK 7 principles—namely Quality Planning, Quality Assurance, and Quality Control—was mostly at a “partial fit” level due to non-standardized documentation and delays in corrective actions. The FYI business process was mapped using Value Stream Mapping (VSM) and Big Picture Mapping (BPM) to classify value-added (VA), non-value-added (NVA), and necessary non-value-added (NNVA) activities. Of the 23 total activities analyzed, 14 were identified as value-added, while 2 were classified as wasteful. The main causes of inefficiency included waiting time, unnecessary inventory, and excessive transportation. These were mitigated through the integration of collaborative spreadsheets and improved stakeholder coordination. The study emphasizes the importance of having a single source of truth in defect monitoring among project stakeholders (owner, contractor, consultant) to enable better communication and decision-making. Results demonstrate that the resolution of FYI pending items was completed earlier than the planned schedule, validating the effectiveness of integrating lean construction tools to enhance PQM outcomes in power plant construction projects.

Authors

Institutions

Publication Details

Journal
Jurnal Pendidikan Indonesia
Published
2025-08-16
DOI
https://doi.org/10.59141/japendi.v6i8.8497
Primary Topic
Management and Optimization Techniques
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Implementasi Project Quality Management dan Perancangan Proses Bisnis Pada Milestone First Years Inspection dan di Proyek Konstruksi di PT PLN Nusantara Power

Hendy Hendy, Oviyan Patra, Evan Nugraha, Nasep Nirwan Batubara
Jurnal Pendidikan Indonesia
Management and Optimization Techniques
article

Implementasi Project Quality Management dan Perancangan Proses Bisnis Pada Milestone First Years Inspection dan di Proyek Konstruksi di PT PLN Nusantara Power

Hendy Hendy, Oviyan Patra, Evan Nugraha, Nasep Nirwan Batubara
article en

Abstract

This study aims to evaluate the implementation of Project Quality Management (PQM) in the First Year Inspection (FYI) milestone of the Muara Tawar Add-On Combined Cycle Power Plant (PLTGU) Block 2 project, and to design an integrated business process using the lean construction approach. A mixed-methods research design was applied, combining observation, in-depth interviews, and document analysis. The findings reveal that the PQM implementation, based on PMBOK 7 principles—namely Quality Planning, Quality Assurance, and Quality Control—was mostly at a “partial fit” level due to non-standardized documentation and delays in corrective actions. The FYI business process was mapped using Value Stream Mapping (VSM) and Big Picture Mapping (BPM) to classify value-added (VA), non-value-added (NVA), and necessary non-value-added (NNVA) activities. Of the 23 total activities analyzed, 14 were identified as value-added, while 2 were classified as wasteful. The main causes of inefficiency included waiting time, unnecessary inventory, and excessive transportation. These were mitigated through the integration of collaborative spreadsheets and improved stakeholder coordination. The study emphasizes the importance of having a single source of truth in defect monitoring among project stakeholders (owner, contractor, consultant) to enable better communication and decision-making. Results demonstrate that the resolution of FYI pending items was completed earlier than the planned schedule, validating the effectiveness of integrating lean construction tools to enhance PQM outcomes in power plant construction projects.

Jurnal Pendidikan IndonesiaVol. 6(8)
Universitas Jenderal Achmad Yani (ID)
Openalex Percentile: Top 68%
Management and Optimization Techniques
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.